Inspections for the day of: Thursday, August 24, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-01098 BLD-Final8/23/20008/24/20008/24/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/23/2000 at 13:06:49. Contact: ###-####.
all ok except need one smoke detector in lower hall way, need to look under floor when reinspect 8/24/2000 10:29:41 AM
also verify Terry Records sign off 8/24/2000 10:37:43 AM
BLD00-01720 BLD-Footing8/23/20008/24/20008/24/2000 12:00:00 AMAPART
RICK--###-#### CELL FT
ok to put #5 rebar pins on footing surface slopes greater than 1/10 per Darrin @ Atwood-H-Jones (6" dowell imbedment w/ caulking around top). Work in progress, looks ok. 8/24/2000 12:16:35 PM
BLD00-00288 BLD-Conference8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
Tom ###-#### please call before going out
conference on stair way and moving rear door 8/24/2000 9:28:23 AM
BLD00-00923 BLD-Framing/Rough-in8/23/20008/24/20008/24/2000 12:00:00 AMAPART
###-#### late pm
still need energy report 8/24/2000 4:42:23 PM
BLD00-01660 BLD-Energy code compliance8/22/20008/24/20008/24/2000 12:00:00 AMAPASS
Scheduled by Inspector: 415 On 8/22/2000 Monty ###-####
BLD00-01723 BLD-Framing/Rough-in8/23/20008/24/20008/24/2000 12:00:00 AMPFAIL
JAKE-- ###-#### FR
conference only on framing , hold downs, need to get engineer approval 8/24/2000 3:46:42 PM
BLD00-01687 BLD-Final8/23/20008/24/20008/24/2000 12:00:00 AMPPART
Bob ###-####
need to verify smoke det. 8/25/2000 11:44:44 AM
BLD00-00142 BLD-Framing/Rough-in8/23/20008/24/20008/24/2000 12:00:00 AMPPART
shear insp Bob ###-####
c/n left ,,, ok to side end units , except for affected areas , need enginer fix on misplaced hold downs 8/25/2000 11:43:24 AM
BLD00-01676 BLD-Final8/24/20008/24/20008/24/2000 12:00:00 AMPFAIL
DEAN-- ###-#### PAGER----CALL 1ST BEFORE INSP--FN