Inspections for the day of: Friday, August 24, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01252 BLD-Final7/18/20018/24/20018/24/2001 12:00:00 AMAFAIL
###-#### NR 8/24/2001 8:32:50 AM
BLD01-01962 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMAPART
###-#### shear Shear OK 8/24/2001 12:46:05 PM
BLD01-01862 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMAPASS
Shane ###-#### reinspection
BLD01-01947 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/23/2001 at 13:12:47. Contact: ###-####.
BLD01-01636 BLD-Final8/23/20018/24/20018/24/2001 12:00:00 AMAPASS
###-#### C/C issued. 8/24/2001 1:28:02 PM
BLD01-01565 BLD-Final8/23/20018/24/20018/24/2001 12:00:00 AMAPASS
###-#### C/C issued. 8/24/2001 1:24:05 PM
BLD01-02110 BLD-Foundation8/24/20018/24/20018/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/24/2001 at 05:08:34. Contact: ###-####.
BLD01-02112 BLD-Foundation8/24/20018/24/20018/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/24/2001 at 05:09:42. Contact: ###-####.
BLD01-01533 BLD-Framing/Rough-in8/24/20018/24/20018/24/2001 12:00:00 AMPPART
###-#### mike sheer panel Shear OK. 8/24/2001 5:50:03 PM
BLD01-01455 BLD-Energy code compliance8/24/20018/24/20018/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/24/2001 at 08:33:08. Contact: ###-####.
BLD01-00032 BLD-Conference8/24/20018/24/20018/24/2001 12:00:00 AMPPART
Checked firestop joint spray and rejected. 8/24/2001 5:49:39 PM
BLD01-01639 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMPFAIL
###-#### don C/N posted. 8/24/2001 3:31:56 PM