BLD01-01416
| BLD-Aging Inspection | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | | NR |
|
|
sign, no call 8/24/2001 10:09:58 AM
|
BLD01-00594
| BLD-Conference | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/24/2001 8:47:11 AM ok to prerock tub walls
|
BLD01-01921
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
DREW ###-#### FR--CALL ST BEFORE INSP roof ok; ok to insul 8/24/2001 11:25:31 AM
|
BLD01-00594
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
###-#### jim ok to cover at tubs at party wall only. 8/24/2001 11:04:38 AM
|
BLD01-00601
| BLD-Foundation | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
###-####= JIM FD SLAB
|
BLD01-00609
| BLD-Foundation | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
FD SLAB ###-####
|
BLD01-00602
| BLD-Foundation | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
FOUND SLAB ###-####
|
BLD01-01492
| BLD-Final | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | NR |
|
|
###-####...need consult w/ fire prior to final. 8/24/2001 2:30:15 PM
|
BLD01-00839
| BLD-Final | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PASS |
|
|
DOC- ###-####-PLEASE CALL 1/2 BEFORE INSP -FN final ok for l/c only. rec'd MTI insp report ok. 8/24/2001 11:25:11 AM
|
BLD01-01958
| BLD-Final | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PASS |
|
|
###-#### R/I -SHELVING -BOB ok for l/c 8/24/2001 4:27:24 PM
|
BLD01-02226
| BLD-Conference | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PASS |
|
|
around 1:30 if possible steve ###-####; re purlins; need original inspection report, but in my opinion purlins not req'd 8/24/2001 3:08:26 PM
|
BLD00-03068
| BLD-Final | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 10:11:43. Contact: ###-####. c/n,thresholds, exit doors (chk break away hdwe at main entry, etc. see c/n. ok for t/o. 8/24/2001 4:32:52 PM
|
BLD01-01958
| BLD-Conference | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/24/2001 4:39:33 PM w/ installer, ok to paint load signs on cross-bars.
|
BLD00-02752
| BLD-Final | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | FAIL |
|
|
###-#### dan; C/n, firestop bsmt lid penetrations, manual bolts at doors, etc...ok for t/o. 8/24/2001 5:35:07 PM
|
BLD01-02295
| BLD-Framing/Rough-in | 8/21/2001 | 8/24/2001 | 8/23/2001 12:00:00 AM | A | CANC |
|
|
###-####
|