FIR06-00063
| INSP-Sprinkler Rough-in | 8/22/2006 | 8/24/2006 | 8/25/2006 9:17:20 AM | A | PART |
|
|
Field inspection of phase two sprinkler rough-in of the project as marked on plans is satisfactory, heads to be installed below ductwork obstruction as discussed.
|
BLD06-01156
| FIRE-Final Inspection | 8/23/2006 | 8/24/2006 | 8/25/2006 9:14:32 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR06-00486
| INSP-Final Inspection | 8/24/2006 | 8/24/2006 | 8/25/2006 9:13:54 AM | P | PASS |
|
|
Corrections have been made, fire sprinkler permit finaled.
|
MIS06-00211
| FIR-Final | 8/23/2006 | 8/24/2006 | 8/24/2006 2:20:54 PM | A | PASS |
|
|
Correction completed, inspection passed.
|
MIS06-00214
| FIR-Final | 8/24/2006 | 8/24/2006 | 8/24/2006 1:59:11 PM | P | PASS |
|
|
c/n items are completed as discussed
|
MIS06-00214
| FIR-Final | 8/23/2006 | 8/24/2006 | 8/24/2006 11:04:36 AM | A | FAIL |
|
|
Need to provide building address, post signage above the main entry/exit door, repair electrical panel cover.
|
BLD05-02973
| FIRE-Final Inspection | 8/23/2006 | 8/24/2006 | 8/24/2006 12:00:00 AM | A | CANC |
|
|
issues not taken care of per michael - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|