Inspections for the day of: Friday, August 24, 2007.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00494 BLD-Aging Inspection8/24/20078/24/20078/31/2007 11:30:59 AM NR
ncfi
BLD07-01262 BLD-Framing/Rough-in8/23/20078/24/20078/24/2007 4:31:47 PMPPART
DAVID Phone #: ###-####framing ok pending mech sign off and phased mezanene to be built later. ada drinking foutian stil and isue for final.
BLD07-01429 BLD-Energy code compliance8/23/20078/24/20078/24/2007 4:29:53 PMPPASS
Scheduled by a contractor via Hello! on 8/23/2007 at 7:29:34 AM. Contact: ###-####.
BLD07-01977 BLD-Framing/Rough-in8/24/20078/24/20078/24/2007 3:24:00 PMPPART
jerry - please call 1 hr prior to inspection Phone #: ###-#### truss brace and floor brace needed. ok to insulate.
BLD06-03597 BLD-Other8/23/20078/24/20078/24/2007 1:48:48 PMPPASS
Steve; Phone #: ###-#### note: :fire rated soffit gyp. ok to cover.
BLD06-03594 BLD-Other8/23/20078/24/20078/24/2007 1:48:20 PMPPASS
Steve; Phone #: ###-#### Note:fire rated soffit gyp. ok to cover.
BLD06-03408 BLD-Final8/23/20078/24/20078/24/2007 1:26:29 PMAPART
Scheduled by a contractor via Hello! on 8/23/2007 at 12:38:56 PM. Contact: ###-####.final ok for perm pending ele final aproval.
BLD07-01734 BLD-Framing/Rough-in8/23/20078/24/20078/24/2007 11:44:48 AMAFAIL
Kelly; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt remove screws from ceilling grid and brace to structure, phased job storage area only part insp.
BLD07-01152 BLD-Footing8/24/20078/24/20078/24/2007 11:21:23 AMAPASS
Scheduled by a contractor via Hello! on 8/24/2007 at 12:39:17 AM. Contact: ###-####.garage ft
BLD07-01153 BLD-Footing8/24/20078/24/20078/24/2007 11:21:00 AMAPASS
Scheduled by a contractor via Hello! on 8/24/2007 at 12:40:20 AM. Contact: ###-####.garage ft
BLD07-01737 BLD-Framing/Rough-in8/23/20078/24/20078/24/2007 11:13:03 AMAFAIL
Scheduled by a contractor via Hello! on 8/23/2007 at 2:02:05 PM. Contact: ###-####. beam calulations for all beams over cut at bearing/ bearing thur floor sys / no insulation.
BLD07-01119 BLD-Framing/Rough-in8/23/20078/24/20078/24/2007 10:48:33 AMAPART
Jack; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt no truss engineering on site need to review at insulation insp. as well as post and beam support at jack trusses at hall not in place.
BLD07-01374 BLD-Final8/23/20078/24/20078/24/2007 10:28:02 AMAFAIL
matt Phone #: ###-#### deadbolt lock indacator/ pending others.
BLD07-00443 BLD-Energy code compliance8/23/20078/24/20078/24/2007 10:11:37 AMAPASS
jacob - insulation Phone #: ###-####
BLD07-01543 BLD-Concrete8/23/20078/24/20078/24/2007 10:05:16 AMAPART
Sam, early p.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshauptwip set backs ok
BLD06-03597 BLD-Energy code compliance8/23/20078/24/20078/24/2007 12:00:00 AMPCANC
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD06-03594 BLD-Energy code compliance8/23/20078/24/20078/24/2007 12:00:00 AMPCANC
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt