Inspections for the day of: Friday, August 24, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM07-01258 Final8/24/20078/24/20078/24/2007 4:43:56 PMPPASS
steve Phone #: ###-####
PLM07-02752 Final8/24/20078/24/20078/24/2007 4:14:16 PMPFAIL
###-#### - serja need to double check for premius protection tested and certified need to pipe T&P to an approved location
PLM07-02875 Final8/23/20078/24/20078/24/2007 3:39:26 PMPPASS
Call Doran please. Do the inspection after 3:00pm please Phone #: ###-#### Internet Inspection Request from: joe paige
PLM07-01997 Final8/23/20078/24/20078/24/2007 3:27:07 PMPPART
Partial Final needed.."tiny" tots toilet was damaged so replacement will be installed at some point on Friday 8/24 Phone #: ###-#### Internet Inspection Request from: Penny Smith need 120 degree hot water limitation to existing laves in rest room, s need open front seat on all water closets talked to plumbing contractor will recall when ready
PLM07-02876 Sprinkler (Final)8/24/20078/24/20078/24/2007 2:20:21 PMPPASS
PLM07-02753 Sprinkler (Final)8/24/20078/24/20078/24/2007 2:19:37 PMPPASS
terry Phone #: ###-####
PLM07-02701 Water and/or Sewer8/24/20078/24/20078/24/2007 12:40:41 PMPPASS
water line outside only test ok
PLM07-02873 Sprinkler (Final)8/23/20078/24/20078/24/2007 12:39:48 PMPPASS
donna Phone #: ###-####Note: late afternoon
PLM07-02882 Water Heater Final8/23/20078/24/20078/24/2007 12:05:57 PMAFAIL
Please give Mrs. Black a lead call.
Thanks Phone #: ###-#### Internet Inspection Request from: Mike Dunson need to replace 3 inch flue piping to 4 inch piping need to be same size as flue outlet on appliance called contractor and left correction notice on site
PLM07-00921 Final8/24/20078/24/20078/24/2007 10:36:51 AMAPART
PLEASE USE MIKE W. AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY need main building supply shut off valve installed need to power up water heater and adjust faucet,s for 120 degree hot water limitation for public laves called contractor will recall when ready oked temp.
PLM07-02876 Sprinkler (Final)8/23/20078/24/20078/24/2007 8:57:51 AMANR
jake Phone #: ###-####