Inspections for the day of: Friday, August 24, 2007.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-01611 Final8/24/20078/24/20078/24/2007 5:09:14 PMPPASS
Inspection moved to Friday per Mike Kinnear's instruction. m ok final
ELE07-01612 Final8/24/20078/24/20078/24/2007 3:49:28 PMPPASS
Thank you!! These last 2 units (lots 6 & 7) are both ready if you would like to do them together. Phone #: ###-#### Internet Inspection Request from: Tracy Robertson ok final
ELE07-01598 Permanent Service8/24/20078/24/20078/24/2007 3:14:27 PMPFAIL
wayne Phone #: ###-####Note: for east evelator and main gear there is no inspection for under ground conduit to the service equipment.
ELE07-02814 Electrical Rough-In8/24/20078/24/20078/24/2007 3:10:02 PMPFAIL
wayne Phone #: ###-####Note: for east evelator and main gear there has been no under ground inspection for the service conduits called left message for wayne
ELE07-02941 Final8/24/20078/24/20078/24/2007 2:04:22 PMPPASS
ok final
ELE07-02941 Electrical Rough-In8/23/20078/24/20078/24/2007 2:03:44 PMAPASS
Nick Felsted Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer ok ri
ELE07-02520 Electrical Rough-In8/23/20078/24/20078/24/2007 11:49:04 AMAPASS
Rough-in for clean room remodel ceiling in building 26 for SUP03 ###-####. Phone #: ###-#### Internet Inspection Request from: Del Elwood ok cover ceiling
ELE07-02359 Final8/23/20078/24/20078/24/2007 11:07:45 AMAFAIL
Chris Phone #: ###-#### NEC210.52(A)(2)(1) under window 410.8 (D)(1) closet t/w chris
ELE07-02132 Final8/23/20078/24/20078/24/2007 9:49:07 AMAPASS
Scheduled by a contractor via Hello! on 8/23/2007 at 6:31:47 PM. Contact: ###-####. ok final
ELE07-02553 Final8/23/20078/24/20078/24/2007 8:48:52 AMAPASS
trent Phone #: ###-#### ok final