Inspections for the day of: Monday, August 24, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00033 INSP-Sprinkler Rough-in8/21/20098/24/20098/24/2009 4:29:03 PMPPART
Completed rough-in inspections for systems 23 and 24 including coverage at six rooftop towers, pallet storage single interlock systems 16,17, and 18, reinspection for correction items at system 25, discussed remaining issues at systems 14, 18 and 21 including pipe size changes, racks at the scan room, obstruction at HVAC piping, coverage at ceiling elevation change between system 14 and 11, and inspection schedule for project related FIR 09-00296 fire alarm permit for VESDA and preaction system releasing panel site acceptance testing set for the first requested inspection 8/25.
FIR09-00033 INSP-Sprinkler Rough-in/Hydro8/24/20098/24/20098/24/2009 4:14:26 PMAPART
Hydrostatic retest of rack system #6 at the dry goods warehouse passed.
BLD08-01105 FIRE-Final Inspection8/21/20098/24/20098/24/2009 4:12:46 PMAPART
Items on C/N verified for compliance, fire life safety is satisfactory pending completion of the loop road at the north end of the building and completion of finishes at the dental office.
BLD09-00467 FIRE-Final Inspection8/21/20098/24/20098/24/2009 4:10:16 PMAPASS
Fire life safety inspection passed.
FIR09-00477 INSP-Final Inspection8/21/20098/24/20098/24/2009 4:09:37 PMAFAIL
Missing fire alarm notification at two restrooms.
FIR09-00033 INSP-Alarm Testing8/21/20098/24/20098/24/2009 12:57:46 PMPNR
Pending FIR09-00296
FIR09-00033 INSP-Alarm Testing8/21/20098/24/20098/24/2009 12:57:12 PMANR
Pending FIR09-00296
FIR09-00347 INSP-Final Inspection8/21/20098/24/20098/21/2009 9:40:44 AMPCANC
Scheduled by a contractor via Hello! on 8/21/2009 at 9:39:55 AM. Disp set to [CANC] by a contractor via Hello! on Aug 21 2009 9:40AM.