BLD09-00879
| FIRE-Final Inspection | 8/24/2009 | 8/24/2009 | 8/24/2009 4:37:31 PM | P | PASS |
|
|
Life safety passed
|
FIR09-00433
| INSP-Final Inspection | 8/19/2009 | 8/24/2009 | 8/24/2009 4:36:59 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00343
| INSP-Alarm Testing | 8/24/2009 | 8/24/2009 | 8/24/2009 4:36:19 PM | A | DONE |
|
|
Inspection was actually for a telephone conference.
|
FIR09-00317
| INSP-Sprinkler Rough-in | 8/24/2009 | 8/24/2009 | 8/24/2009 2:03:23 PM | P | PASS |
|
|
The attic portion of system #3 is finished except for verification of correct insulation depth and related sprinkler coverage and the issue with the branchline and main hangers as previously discussed.
|
BLD09-01113
| FIRE-Final Inspection | 8/24/2009 | 8/24/2009 | 8/24/2009 12:52:55 PM | P | PASS |
|
|
Life safety passed
|