Inspections for the day of: Monday, August 24, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00143 Site Final8/24/20098/24/20098/24/2009 1:50:14 PMPPASS
ESC09-00160 Conference8/21/20098/24/20098/24/2009 1:41:20 PMADONE
Went over the phase of the project with the RP. Allowing that filt ter fabric be allowed within the storm drain inlet on the interior of the project during the time of paving occurs. Once paving is complete and cured, that an approved storm drain inlet protection is required. At the lasted of 8/27/09, all storm drain inlets must be protected with an approved method.

Told the RP that he must comply with federal regulations per the CGP and make sure that he can generate the narritive of his ECS plan on 8/28/09 AM. Will re-inspect on 8/28/09 AM.
ESC09-00454 Site Preparation8/24/20098/24/20098/24/2009 12:29:48 PM FAIL
Message to RP:
Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
ESC09-00453 Site Preparation8/24/20098/24/20098/24/2009 12:29:31 PM FAIL
Message to RP:
Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
ESC09-00452 Site Preparation8/24/20098/24/20098/24/2009 12:29:21 PM FAIL
Message to RP:
Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
ESC09-00448 Site Preparation8/24/20098/24/20098/24/2009 12:29:09 PM FAIL
Message to RP:
Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
ESC09-00451 Site Preparation8/24/20098/24/20098/24/2009 12:28:57 PM FAIL
Message to RP:
Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
ESC08-00952 BMP Violation8/20/20098/24/20098/24/2009 9:28:44 AMAPART
Need to protect more of the completed storm drains within the project area. Will be re-inspected on 8/26/09 AM.
ESC09-00520 Site Preparation ESC8/24/20098/24/20098/24/2009 9:00:12 AM DONE
work is complete. took down the metal structure. No disurbed soil.
ESC09-00520 DOC - Permit Finaled8/24/20098/24/20098/24/2009 8:59:33 AMPPASS
ESC09-00526 Site Preparation8/24/20098/24/20098/24/2009 8:41:55 AM PASS
ESC09-00363 Site Preparation8/24/20098/24/20098/24/2009 8:33:11 AM NR
ESC09-00527 Site Preparation8/24/20098/24/20098/24/2009 8:19:29 AM PASS
Concrete company is cleaning out all tools into there skid steer bucket and waiting for it to cure and taking all residual back to yard. Concrete trucks are cleaning out back at batch plant.