BLD09-02032
| FIRE-Final Inspection | 8/24/2010 | 8/24/2010 | 8/25/2010 8:21:31 AM | P | FAIL |
|
|
The west hvac unit tested ok. The east hvac unit would not go into heat mode like it did the day before so that it could be tested.
|
BLD10-00114
| FIRE-Supply Line Cover | 8/24/2010 | 8/24/2010 | 8/24/2010 3:17:49 PM | P | FAIL |
|
|
I spoke to John McCarthy about the requirement for the entire space to be filled with insulation to meet NFPA 13 requirements
|
BLD10-01869
| FIRE-Conference | 8/24/2010 | 8/24/2010 | 8/24/2010 3:14:28 PM | P | DONE |
|
|
The address for this project was wrong. I spoke to Carl Madsen and Tim Frost and had the address corrected.
|
BLD10-01740
| FIRE-Final Inspection | 8/24/2010 | 8/24/2010 | 8/24/2010 1:46:13 PM | P | PASS |
|
|
Life safety passed
|
FIR10-00342
| INSP-Supply line flush | 8/23/2010 | 8/24/2010 | 8/24/2010 11:45:42 AM | A | PASS |
|
|
The underground supply line flush passed inspection.
|
BLD10-01581
| FIRE-Final Inspection | 8/23/2010 | 8/24/2010 | 8/24/2010 11:07:04 AM | A | PASS |
|
|
Life safety passed
|