BLD12-02003
| FIRE-Final Inspection | 8/24/2012 | 8/24/2012 | 8/24/2012 3:55:10 PM | P | PASS |
|
|
life safety passed. lights have been repaired.
|
FIR12-00373
| INSP-Final Inspection | 8/21/2012 | 8/24/2012 | 8/24/2012 3:52:13 PM | P | CANC |
|
|
Chris and I agreed to reschedule this test for monday afternoon since I am overbooked.
|
FIR11-00543
| INSP-Sprinkler Rough-in | 8/23/2012 | 8/24/2012 | 8/24/2012 3:34:51 PM | P | PART |
|
|
Earthquaking in the basement has been correct and piping can now be covered. The rough-in for the piping in the Chiller is basically ok except a upright has been installed in a pendant position, one upright needs to be change and installed as a pendant to clear a beam and the hydraulic calculations need to be resubmitted for the chiller room since seven 1" elbows have been installed on one of the branchlines to the heads in the remote area.
|
BLD11-01269
| FIRE-Final Inspection | 8/24/2012 | 8/24/2012 | 8/24/2012 3:31:36 PM | P | PASS |
|
|
Life safety passed
|
BLD11-01269
| FIRE-Alarm Testing | 8/24/2012 | 8/24/2012 | 8/24/2012 2:50:36 PM | P | DONE |
|
|
Alarm testing was previously completed.
|
FIR12-00351
| INSP-Final Inspection | 8/23/2012 | 8/24/2012 | 8/24/2012 1:20:09 PM | A | FAIL |
|
|
Phone lines 1 and 2, flow switch, tamper switches and hvac units 3 and 4 tested ok. Stopped inspection due to monitor modules being wired incorrectly and shipping plugs still installed in the duct detectors. Signals sent were verified through ADT. Need as-builts showing the additional tamper switches.
|
BLD12-02003
| FIRE-Final Inspection | 8/22/2012 | 8/24/2012 | 8/24/2012 9:53:56 AM | A | FAIL |
|
|
Repair the three existing exit signs
|
BLD10-02526
| FIRE-Final Inspection | 8/23/2012 | 8/24/2012 | 8/24/2012 9:12:51 AM | A | PASS |
|
|
life safety passed
|