Inspections for the day of: Friday, August 24, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCB12-00097 GCB-Final8/24/20128/24/20128/24/2012 4:10:28 PMPPART
Matt @ ###-####. Ok for temp occ. Must have repairs made by 8-29-31.
BLD12-00684 BLD-Wall Bracing8/24/20128/24/20128/24/2012 2:55:05 PMPPASS
kelly Phone #: ###-####. Exterior shear wall and all required straps installed. ok to cover.
BLD10-02069 BLD-Conference8/24/20128/24/20128/24/2012 12:22:47 PMADONE
Final Building inspection Phone #: ###-#### >> Inspection requested via web by Scott Greer. Walk through with contractor. Noted that not all glazing is in place or door hardware. Needs to repair handrails in shop, provide guard at chiller. ADA unisex restroom has been made compliant. A letter has been sent to building official regarding the non compliant restroom. Also need as built drawings for review.
BLD12-02016 BLD-Energy code compliance8/23/20128/24/20128/24/2012 10:14:33 AMAPASS
Late morning if possible - Monica Phone #: ###-####
BLD12-00806 BLD-Final8/24/20128/24/20128/24/2012 10:00:49 AMAPASS
tim Phone #: ###-####.
BLD12-00806 DOC - Permit Finaled8/24/20128/24/20128/24/2012 10:00:30 AMPPASS
BLD12-00806 BLD-Final8/23/20128/24/20128/24/2012 9:30:13 AMACANC
tim Phone #: ###-####.
BLD12-02238 BLD-Framing/Rough-in8/23/20128/24/20128/24/2012 9:29:18 AMAPEND
Tim Phone #: ###-####. New wood framed wall seperating laundry room from garage. athis portion of work has already been completed with no permits. Noted it has electrical in wall.