PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, August 24, 2012
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00889
General Inspection
8/24/2012
8/24/2012
8/27/2012 2:48:05 PM
PASS
No activity seen.
ESC12-00557
BMP Violation
8/22/2012
8/24/2012
8/27/2012 12:00:00 AM
A
PART
Perimeter control fixed but still has trackout/sediment on road due to not using a stabilized access point to yard. Kiddie pool washout staged at edge of yard within 50 feet to storm drain and has holes in the bottom. All liquid was hardened. Washout pool needs to be disposed of ASAP. Left message for RP
ESC12-00306
Aging Inspection
8/24/2012
8/24/2012
8/24/2012 10:50:31 AM
PASS
ESC12-00745
Site Preparation
8/24/2012
8/24/2012
8/24/2012 10:25:23 AM
PASS
ESC12-00355
Aging Inspection
8/24/2012
8/24/2012
8/24/2012 10:24:21 AM
PASS
ESC12-00844
Site Preparation
8/24/2012
8/24/2012
8/24/2012 10:22:51 AM
NR
ESC12-00287
Aging Inspection
8/24/2012
8/24/2012
8/24/2012 10:22:16 AM
DONE
Permmit finaled.
ESC12-00287
DOC - Permit Finaled
8/24/2012
8/24/2012
8/24/2012 10:22:06 AM
P
PASS
ESC12-00792
Site Preparation
8/24/2012
8/24/2012
8/24/2012 10:21:55 AM
PART
Started to mobilize, but activity yet.
ESC12-00077
General Inspection
8/24/2012
8/24/2012
8/24/2012 8:04:05 AM
FAIL
Many of vacant lot have not been stabilized since the completion of the land development phase. the time has exceeded the 14 day period of the EPA requirements. Will discuss with upper management over the violation for corrective actions needed.
ESC12-00429
BMP Violation
8/22/2012
8/24/2012
8/23/2012 9:27:30 AM
A
PASS