ESC12-00812
| Site Preparation | 8/24/2012 | 8/24/2012 | 8/24/2012 12:00:00 AM | | PART |
|
|
All BMPS per plan have been installed. This includes inlet protection and dust control measures. Very few materials are staged on site at this point. Told RP to install perimeter control on the north side of employee parking area.
|
ESC12-00510
| BMP Violation | 8/24/2012 | 8/24/2012 | 8/24/2012 12:00:00 AM | A | PART |
|
|
stabilized entrance installed, DI's maintained, needs to remove dirt from gutter
|
ESC12-00511
| BMP Violation | 8/24/2012 | 8/24/2012 | 8/24/2012 12:00:00 AM | A | PART |
|
|
stabilized entrance installed, DI's maintained, needs to remove dirt from gutter
|
ESC12-00206
| Random Inspection | 8/24/2012 | 8/24/2012 | 8/24/2012 12:00:00 AM | A | PASS |
|
|
Site is actively being disturbed. Installation of underground sprinkers and limited landscaping
|
ESC11-00176
| Conference | 8/24/2012 | 8/24/2012 | 8/24/2012 12:00:00 AM | A | DONE |
|
|
Went to site at 8:00 AM to initiate stop work order on exterior work. Noted need to clean sediment off of sidewalk/roadways. Met with superintendent who called a crew over from the neighboring sites to perform clean up actions.
|