FIR16-00435
| INSP-Sprinkler Rough-in | 8/24/2016 | 8/24/2016 | 8/24/2016 1:30:34 PM | P | PART |
|
|
Rough-in passed except for one head that is missing in a second floor west end restroom. No tenting has been installed or inspected so no piping can be covered.
|
NAF16-00034
| INSP-Conference | 8/24/2016 | 8/24/2016 | 8/24/2016 1:28:00 PM | P | DONE |
|
|
Went over underground supply bury requirements.
|
BLD15-04264
| FIRE-Conference | 8/24/2016 | 8/24/2016 | 8/24/2016 1:16:19 PM | P | DONE |
|
|
Jeff and I went over life safety requirements. See the fire review notes for items marked ok and items circled that need addressed for a final inspection.
|
FIR16-00443
| INSP-Sprinkler Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 10:54:23 AM | A | CANC |
|
|
No approved drawings and per conversation it appears plans will need to be re-submitted.
|
FIR16-00439
| INSP-Sprinkler Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 10:53:44 AM | A | FAIL |
|
|
Plans need to be re-submitted showing all of the pipe routing changes and additional fittings. No tenting has been completed. No rough-in inspection performed due to changes.
|
FIR16-00107
| INSP-Final Inspection | 8/23/2016 | 8/24/2016 | 8/24/2016 9:15:08 AM | A | FAIL |
|
|
Provide seismic bracing at the 19' level of the new riser as per the approved plans.
|
FIR16-00117
| INSP-Final Inspection | 8/23/2016 | 8/24/2016 | 8/24/2016 9:14:31 AM | A | FAIL |
|
|
Provide siesmic bracing at the old riser location and provide clearance at wall penatration at the same location.
|
FIR15-00828
| INSP-Final Inspection | 8/23/2016 | 8/24/2016 | 8/24/2016 9:13:19 AM | A | PASS |
|
|
Permit finaled
|