PLM17-03140
| Final | 8/22/2017 | 8/24/2017 | 8/24/2017 4:57:58 PM | P | NH |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM16-04510
| Final | 8/22/2017 | 8/24/2017 | 8/24/2017 4:57:58 PM | P | PEND |
|
|
Carl Phone #: ###-####
|
PLM16-04462
| Final | 8/24/2017 | 8/24/2017 | 8/24/2017 4:57:57 PM | P | PART |
|
|
rooms 127 through 149
|
PLM17-03188
| Plumbing Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 2:01:19 PM | P | PASS |
|
|
Cal when on way Phone #: ###-#### Inspection requested via web by Ben Davis
|
PLM17-03200
| Sprinkler (Final) | 8/24/2017 | 8/24/2017 | 8/24/2017 1:39:40 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Roark. the backflow needs to be certified. Dry out the hole, find and repair the leak.
|
PLM17-03156
| Final | 8/23/2017 | 8/24/2017 | 8/24/2017 11:47:44 AM | A | FAIL |
|
|
After 9am, Thank you!! Phone #: ###-#### Inspection requested via web by Xanti Berria. The water heater drain pan is blocking the floor drain and condensation is running all over the mechanical room floor. Either remove the drain pan or drill a hole in it and run the condensate drain into the floor drain
|
PLM16-04462
| Final | 8/23/2017 | 8/24/2017 | 8/24/2017 11:24:57 AM | A | PART |
|
|
partial final Phone #: ###-#### Inspection requested via web by PATTY KIRK
|
PLM17-03054
| Water and/or Sewer | 8/23/2017 | 8/24/2017 | 8/24/2017 11:01:38 AM | A | PART |
|
|
Alex-water line only Phone #: ###-####. Install sprinkler shut-off, draindown valves and the backflow assembly prior to backfilling. Have the backflow assembly certified for final
|
PLM17-03071
| Plumbing Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 10:36:13 AM | A | PASS |
|
|
Candice Phone #: ###-####
|
MIS17-00265
| PLM-Conference | 8/24/2017 | 8/24/2017 | 8/24/2017 10:18:20 AM | P | FAIL |
|
|
Cory Phone #: ###-####. Install a tempering valve at each shampoo bowl and the public restroom lavatory sink or install one 3/4" tempering valve at the water heater.
Get access the the builiding backflow assembly to verify certification.
|
PLM17-02639
| Final | 8/24/2017 | 8/24/2017 | 8/24/2017 9:46:55 AM | A | PASS |
|
|
Includes sewer stub-ins and water service lines.
|
PLM17-01593
| Plumbing Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 9:45:46 AM | A | PASS |
|
|
Please call Chris to let know when on way. ###-#### Phone #: ###-#### Inspection requested via web by Kevin Smith
|
PLM17-02564
| Final | 8/23/2017 | 8/24/2017 | 8/24/2017 9:27:20 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM17-02151
| Water and/or Sewer | 8/23/2017 | 8/24/2017 | 8/24/2017 9:07:59 AM | A | PASS |
|
|
Chad Phone #: ###-####
|
PLM17-02151
| Final | 8/24/2017 | 8/24/2017 | 8/24/2017 9:07:45 AM | A | PASS |
|
|
Chad Phone #: ###-####
|
PLM17-02455
| Final | 8/23/2017 | 8/24/2017 | 8/24/2017 8:43:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK
|