ELE18-03225
| Final | 8/24/2018 | 8/24/2018 | 8/24/2018 3:01:40 PM | P | FAIL |
|
|
Things have been corrected per your request although the rear W/P did have a GFI in it, let me know if you have any question thanks Phone #: ###-#### Inspection requested via web by Brad Baaker 210.8 All outdoor receptacle shall be GFCI protected 210.7 Mutti wire branch circuit shall have common trip handle(removed handle tie to placemlockouts on breaker for dishwasher and hood)
|
ELE18-01887
| Permanent Service | 8/24/2018 | 8/24/2018 | 8/24/2018 3:01:40 PM | P | PASS |
|
|
We are having the power disconnected at about 10 am. and then we have to connect the new panels to the main service. We hope to be done by about noon, so if possible to inspect after noon should be done. And will need to get power back on as soon as we can. Thanks Phone #: ###-#### Inspection requested via web by robert feller IDPCO already energized prior to inspection and AFC calc will be posted at final and they fuses so should be ok p/s o/h ec ok
|
ELE18-02673
| Final | 8/24/2018 | 8/24/2018 | 8/24/2018 12:43:38 PM | P | PASS |
|
|
Corbin ###-#### or Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Corrections fixed final ok
|
ELE18-02594
| Electrical Rough-In | 8/24/2018 | 8/24/2018 | 8/24/2018 12:37:31 PM | P | PASS |
|
|
Sorry for the confusion Please provide them with a ceiling inspection so they can lay in the tile and move forward toward final, thanks Phone #: ###-#### Inspection requested via web by Brad Baker Ceiliong only ok to cover
|
ELE18-02562
| Electrical Rough-In | 8/24/2018 | 8/24/2018 | 8/24/2018 11:55:03 AM | P | PASS |
|
|
Contact: Caleb Burke. Ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Sun roo ok to cover
|
ELE18-02665
| Electrical Rough-In | 8/23/2018 | 8/24/2018 | 8/24/2018 10:54:52 AM | A | PASS |
|
|
Contact: Rich Bail... underground inspection, south side please Phone #: ###-#### Inspection requested via web by Deb Gooden South end secondary from transformer ok to cover
|
ELE18-01463
| Final | 8/23/2018 | 8/24/2018 | 8/24/2018 10:54:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tarah Young Final ok
|
ELE18-02673
| Final | 8/23/2018 | 8/24/2018 | 8/24/2018 10:07:24 AM | A | FAIL |
|
|
Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Tamper resisitant required (GFCI's and Island ) and spark rings
|
ELE18-02946
| Final | 8/23/2018 | 8/24/2018 | 8/24/2018 9:26:41 AM | A | PASS |
|
|
as early as possible // Diana Phone #: ###-#### Basement craft room only ok to cover
|