Inspections for the day of: Friday, August 25, 2000.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01021 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/24/2000 at 09:04:20. Contact: ###-####. gave to 408... 8/25/2000 8:48:32 AM
BLD00-00862 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMAPASS
jim ###-#### fn, lc16980 8/25/2000 2:38:04 PM
BLD00-02032 BLD-Framing/Rough-in8/24/20008/25/20008/25/2000 12:00:00 AMAFAIL
jerry--###-#### fr; c/n firestops, 2hr wall ass'y at new openings,etc 8/25/2000 11:42:16 AM
BLD00-01554 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMAFAIL
c/n re detail for deletion of office; letter not acceptable ( per DH) 8/25/2000 10:15:16 AM
BLD00-01554 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMAPART
Added by Inspector: 340 On 8/24/2000 CALL TODD 395 1920 8/24/2000 4:46:10 PM
BLD99-02200 BLD-Wall cover8/24/20008/25/20008/25/2000 12:00:00 AMAPART
Added by Inspector: 340 On 8/24/2000 GYPSUM NAILING
BLD99-02201 BLD-Wall cover8/24/20008/25/20008/25/2000 12:00:00 AMAPART
Added by Inspector: 340 On 8/24/2000 GYPSUM
BLD99-02146 BLD-Wall cover8/25/20008/25/20008/25/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/25/2000 at 07:00:06. Contact: ###-####., int gyp at 1hr
8/25/2000 9:31:47 AM
BLD00-01571 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/24/2000 at 13:25:30. Contact: ###-####...NEED FIRE, OTHER SIG'S. NO OTHER INSP PE 8/25/2000 10:36:03 AM FORMED 8/25/2000 10:36:10 AM
BLD00-02021 BLD-Framing/Rough-in8/25/20008/25/20008/25/2000 12:00:00 AMANR
Added by Inspector: 340 On 8/25/2000 tie downs, ###-#### 8/25/2000 8:39:52 AM
BLD00-01138 BLD-Framing/Rough-in8/25/20008/25/20008/25/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/25/2000 at 08:35:28. Contact: ###-####. c/n,straps, fireblox nailing, et 8/25/2000 2:41:01 PM
BLD00-01787 BLD-Framing/Rough-in8/24/20008/25/20008/25/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/24/2000 at 14:49:53. Contact: ###-####....draft stop/ occ sep ok 8/25/2000 4:30:44 PM
MEC00-01789 Final8/25/20008/25/20008/25/2000 12:00:00 AMPPASS
Kelly ###-#### builder called reinspection; ok per 408 8/25/2000 9:42:41 AM
BLD00-01840 BLD-Framing/Rough-in8/25/20008/25/20008/25/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/25/2000 at 08:23:59. Contact: ###-####.c/n: efis system not for vn?? work concealed prior to insp. need other r/i's 8/25/2000 12:24:18 PM
BLD99-03170 BLD-Final8/24/20008/25/20008/25/2000 12:00:00 AMPFAIL
jerry-- ###-#### fn...nr 8/25/2000 4:38:23 PM