BLD00-01924
| BLD-Energy code compliance | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 11:50:40. Contact: ###-####. this has already been done by me. 8/25/2000 3:13:29 PM
|
MEC00-02728
| Rough-in | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 12:13:51. Contact: ###-####.gas test failed. 8/25/2000 4:29:37 PM
|
BLD00-02070
| BLD-Footing | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | FAIL |
|
|
Brent ###-####c/n posted not per plans. 8/25/2000 5:16:35 PM
|
BLD00-01200
| BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
doug ###-#### fn--re-insp --call 1st before insp please---
|
BLD00-01697
| BLD-Framing/Rough-in | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | FAIL |
|
|
###-#### c/n posted fire block and wattsun mec. 8/25/2000 3:58:03 PM
|
BLD00-01943
| BLD-Framing/Rough-in | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PART |
|
|
shear Shelly ###-#### Need to complete shear over front door. 8/25/2000 2:23:11 PM
|
BLD00-02317
| BLD-Footing | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PART |
|
|
dane-- ###-#### ft Pored appears ok. 8/25/2000 4:10:52 PM
|
BLD00-01625
| BLD-Wall cover | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 07:27:30. Contact: ###-####.
|
BLD00-01625
| BLD-Framing/Rough-in | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 07:28:07. Contact: ###-####. need approved plans. 8/25/2000 4:29:16 PM
|
BLD00-01021
| BLD-Footing | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Early start.
|
BLD00-01165
| BLD-Final | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 407 On 8/25/2000
|
BLD00-01873
| BLD-Framing/Rough-in | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 11:01:16. Contact: ###-####.
|
MEC00-01407
| Final | 8/28/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 407 On 8/28/2000 There is no gas appliance in the room with-in the garage.but a gas stub is in place.
|
BLD00-02255
| BLD-Foundation | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 09:34:02. Contact: ###-####.CANCEL PER LOGAN
|
BLD00-02255
| BLD-Foundation | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 09:34:02. Contact: ###-####. Cancelled by contractor.
8/25/2000 3:59:17 PM
|
BLD00-02244
| BLD-Foundation | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | PASS |
|
|
###-####
|