BLD00-01901
| BLD-Final | 8/23/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 09:27:51. Contact: ###-####.
|
BLD00-01120
| BLD-Foundation | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 13:28:59. Contact: ###-####.
wip on interior footing , and engineer fix on outside bearing wall and outside colums (part change in plans back to original plan) 8/25/2000 11:49:23 AM
|
BLD00-01676
| BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 415 On 8/24/2000
dean ###-#### 8/24/2000 3:47:25 PM
c of c # 19728 issued 8/25/2000 2:26:34 PM
|
BLD00-01687
| BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 415 On 8/24/2000
|
BLD00-02078
| BLD-Final | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 08:55:45. Contact: ###-####.
constructed per plan, but I feel it should have a 1 hr. firewall seperation from the house.(to close) 8/25/2000 2:06:21 PM
|
BLD00-02392
| BLD-Footing | 8/25/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | FAIL |
|
|
###-####
old dump area in back of hole, need soil engineering b-4 pouring mud. no prperty pins visible, no forms on job. 8/25/2000 12:48:45 PM
|
BLD00-02195
| BLD-Framing/Rough-in | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | PART |
|
|
mark-- ###-#### fr insp
partial frame inspection for cover , ok,( look at plans where I marked) 8/25/2000 3:36:03 PM
|
BLD96-03235
| BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 13:45:51. Contact: ###-####.
C/N left on site w/ contractor. met w/ 338, project not built per approved plans,( upper corridor) 8/25/2000 4:47:56 PM
|