Inspections for the day of: Monday, August 25, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00452 FIRE-Final Inspection8/20/20038/25/20038/25/2003 12:00:00 AMAPASS
nick; Phone #: ###-#### Fire life safety finaled. Contractor still needed to hang the two upstairs apartment doors. Structural inspector to please verify. 8/25/2003 2:31:26 PM
BLD03-01233 FIRE-Final Inspection8/21/20038/25/20038/25/2003 12:00:00 AMAFAIL
steve; Phone #: ###-#### Provide lever hardware on the door in reception office 8/25/2003 12:16:19 PM
MIS03-00158 FIR-Final8/21/20038/25/20038/25/2003 12:00:00 AMAPASS
fire life safety finaled 8/25/2003 10:43:16 AM
BLD02-00730 FIRE-Sprinkler Rough-in8/22/20038/25/20038/25/2003 12:00:00 AMAPART
See the approved plans for the rooms that the sprinkler pipig is OK to cover. Also see plans for location of sprinkler pendant that needs replaced, closet with missing pendant and the Soiled Linen room should be ordinary hazard spacing not light hazard 8/25/2003 10:59:17 AM
FIR03-00474 INSP-Sprinkler Rough-in8/22/20038/25/20038/25/2003 12:00:00 AMAPART
Underground sprinkler piping is OK to cover 8/25/2003 10:47:09 AM
FIR03-00376 INSP-Sprinkler Rough-in/Hydro8/25/20038/25/20038/25/2003 12:00:00 AMPPART
sam; Phone #: ###-#### The remaining underground supply piping is ok to cover on the north building 8/25/2003 3:20:09 PM
FIR03-00350 INSP-Final Inspection8/25/20038/25/20038/25/2003 12:00:00 AMPFAIL
provide annual ispection for the fire sprinkler system and hydraulic placard for the new system to be placed at the riser 8/25/2003 4:39:26 PM