Inspections for the day of: Thursday, August 25, 2005.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00842 Random Inspection8/25/20058/25/20058/25/2005 1:15:32 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00843 Random Inspection8/25/20058/25/20058/25/2005 1:15:13 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00840 Random Inspection8/25/20058/25/20058/25/2005 1:14:52 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00848 Random Inspection8/25/20058/25/20058/25/2005 1:14:28 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-01010 Random Inspection8/25/20058/25/20058/25/2005 1:14:08 PMPCANC
ESC05-00529 Random Inspection8/25/20058/25/20058/25/2005 1:13:35 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00538 Random Inspection8/25/20058/25/20058/25/2005 1:13:18 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00536 Random Inspection8/25/20058/25/20058/25/2005 1:13:02 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC05-00537 Random Inspection8/25/20058/25/20058/25/2005 1:12:43 PMPPART
Talked to RP about getting ESC signs posted and keeping up on mud and dirt trackout.
ESC04-01336 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:08:09 PMPPASS
Final stabilization has been completed.
ESC05-00153 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:07:57 PMPPASS
Final stabilization has been completed.
ESC04-00718 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:07:45 PMPPASS
Final stabilization has been completed.
ESC05-01010 Random Inspection8/25/20058/25/20058/25/2005 1:04:54 PMPPART
Contacted RP about trash and debris on site. Will follow up.
ESC04-00757 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:03:17 PMPPASS
Final stabilization has been completed.
ESC04-00744 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:01:52 PMPPASS
Final stabilization has been completed.
ESC04-00592 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:01:03 PMPPASS
Final stabilization has been completed.
ESC04-00630 Random Inspection8/25/20058/25/20058/25/2005 1:00:28 PMPCANC
ESC04-00630 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:00:19 PMPPASS
Final stabilization has been completed.
ESC04-00629 DOC - Permit Finaled8/25/20058/25/20058/25/2005 1:00:04 PMPPASS
Final stabilization has been completed.
ESC05-00627 Random Inspection8/25/20058/25/20058/25/2005 9:23:48 AMPFAIL
c/n issued to address access control needed on McKinney and the construction entrance called for in the plan on Allumbaugh needs to be used and maintained. ESC sign must be re-posted at main entrance.
ESC05-00781 Random Inspection8/25/20058/25/20058/25/2005 9:22:34 AMPFAIL
c/n issed to address access control needed off of McKinney to prevent trackout. Construction entrance on Allumbaugh needs maintained and needs to be used as called for in ESC plan. ESC sign must be re-posted at main entrance to site. Will follow up.