FIR08-00429
| INSP-Sprinkler Rough-in/Hydro | 8/25/2008 | 8/25/2008 | 8/25/2008 4:48:37 PM | P | PART |
|
|
OH inspection for the court area mains and branchlines only completed today-the lower mezzanine piping is not yet installed, noted one missing EQ brace at the NW corner-location circled on plans, noted high temp. heads in place at the vicinity of the unit heaters, riser is not built.
|
FIR08-00473
| INSP-Final Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 4:41:52 PM | P | PASS |
|
|
C/N items from last inspection are complete, fire sprinkler permit finaled.
|
BLD08-01094
| FIRE-Final Inspection | 8/22/2008 | 8/25/2008 | 8/25/2008 1:42:32 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR08-00498
| INSP-Final Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 1:42:07 PM | P | PASS |
|
|
Corrections verified for compliance, fire sprinkler permit okay for final as uprights at the plan mod. area are installed.
|
FIR08-00388
| INSP-Sprinkler Rough-in | 8/22/2008 | 8/25/2008 | 8/25/2008 1:06:19 PM | A | FAIL |
|
|
SW heads at the sign tower antifreeze loop are overspaced and below max. listed distance from the ceiling, noted several missing retaining straps at numerous locations including mains and branch lines-somel installed while on site, combustibles above the restrooms must be removed or protection provided, waiting area drops are 3/4"-plan shows 1/2" heads, four upright heads at the stock room are obstructed by beams or exceed min. spacing.
|
BLD07-03063
| FIRE-Final Inspection | 8/22/2008 | 8/25/2008 | 8/25/2008 11:37:43 AM | A | PASS |
|
|
Three exit signs repaired while on site, contractor to replace the fire extinguisher with one tagged/certified extinguisher per discussion and code review notes, remainder of life safety items tested okay, inspection passed.
|
FIR07-00905
| INSP-Final Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 11:34:46 AM | A | PASS |
|
|
Verified corrections, seismic clearance provided, fire supply line flush completed, UG permit finaled.
|
FIR07-00905
| INSP-Supply line flush | 8/22/2008 | 8/25/2008 | 8/25/2008 11:32:45 AM | A | PART |
|
|
UG fire supply line flush completed okay.
|