BLD06-02303
| BLD-Concrete | 8/25/2008 | 8/25/2008 | 8/25/2008 4:48:58 PM | P | PART |
|
|
brad Phone #: ###-#### roof deck mti on site
|
BLD08-00985
| BLD-Framing/Rough-in | 8/25/2008 | 8/25/2008 | 8/25/2008 4:06:58 PM | P | PART |
|
|
jay - ceiling cover Phone #: ###-####ok to cover
|
BLD08-01420
| BLD-Framing/Rough-in | 8/25/2008 | 8/25/2008 | 8/25/2008 4:06:05 PM | P | PASS |
|
|
Ryan- call 15 min prior to going Phone #: ###-#### ok to insulate
|
BLD08-01667
| BLD-Conference | 8/25/2008 | 8/25/2008 | 8/25/2008 2:07:34 PM | P | DONE |
|
|
Doug Phone #: ###-####
|
BLD08-01094
| BLD-Final | 8/22/2008 | 8/25/2008 | 8/25/2008 1:42:36 PM | P | PASS |
|
|
james Phone #: ###-#### ok for perm occ
|
BLD08-00498
| BLD-Final | 8/25/2008 | 8/25/2008 | 8/25/2008 1:19:03 PM | P | PASS |
|
|
Gary Phone #: ###-####
|
BLD07-01690
| BLD-Final | 8/21/2008 | 8/25/2008 | 8/25/2008 11:19:28 AM | A | PASS |
|
|
Kelly Wilson ###-#### ok for perm occ
|
BLD07-02836
| BLD-Framing/Rough-in | 8/22/2008 | 8/25/2008 | 8/25/2008 11:19:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/22/2008 at 1:51:59 PM. Contact: ###-####.
|
BLD07-02993
| BLD-Conference | 8/22/2008 | 8/25/2008 | 8/25/2008 10:39:20 AM | A | PASS |
|
|
Robert Phone #: ###-####
|
BLD08-01438
| BLD-Foundation | 8/22/2008 | 8/25/2008 | 8/25/2008 9:07:54 AM | A | PART |
|
|
gordon Phone #: ###-#### roof drain catch basins ok to pour
|
BLD08-01678
| BLD-Footing | 8/18/2008 | 8/25/2008 | 8/25/2008 12:00:00 AM | A | CANC |
|
|
xavie - as early as possible Phone #: ###-####
|