ESC08-00548
| Site Preparation | 8/25/2008 | 8/25/2008 | 8/25/2008 4:02:55 PM | P | PART |
|
|
ESC permit sign posted. Needs to clean debris from around dumpster. Verbal to RP.
|
BLD08-01363
| BLD-Footing | 8/25/2008 | 8/25/2008 | 8/25/2008 4:02:19 PM | P | PART |
|
|
Eric Phone #: ###-####. Interior column pad footings for new bldg. front.
|
BLD08-01774
| BLD-Foundation | 8/25/2008 | 8/25/2008 | 8/25/2008 4:01:45 PM | P | PART |
|
|
Preston Reynolds ###-####, ###-####; late as possible. anchors for sill plate.
|
BLD08-00949
| BLD-Final | 8/25/2008 | 8/25/2008 | 8/25/2008 2:43:13 PM | P | NR |
|
|
floyd Phone #: ###-#### - please call 1/2 hr prior to inspection. Needs to post no smoking signs as per fire insp. Structure is ok. reviewed special insp. reports. ok. Contractor to post signs and recall for finals.
|
ESC08-00418
| Site Final | 8/25/2008 | 8/25/2008 | 8/25/2008 2:02:37 PM | P | PASS |
|
|
Site is clean and graded. 70% reveg ok.
|
BLD08-01008
| BLD-Final | 8/25/2008 | 8/25/2008 | 8/25/2008 1:52:47 PM | P | PASS |
|
|
ray Phone #: ###-####
|
BLD08-01008
| DOC - Permit Finaled | 8/25/2008 | 8/25/2008 | 8/25/2008 1:52:38 PM | P | PASS |
|
|
cert of occ. issued.
|
BLD08-00984
| BLD-Final | 8/25/2008 | 8/25/2008 | 8/25/2008 10:51:04 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 7:17:50 AM. Contact: ###-####. Still needs elec. and plumbing to sign perm occ.
|
ESC08-00490
| Random Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 9:51:45 AM | A | PASS |
|
|
BMP's in place. ESC permit sign posted at controlled entry point. Track out is ok.
|
BLD08-01210
| BLD-Footing | 8/22/2008 | 8/25/2008 | 8/25/2008 9:50:29 AM | A | PASS |
|
|
dale Phone #: ###-####. Mat footing for north stair tower and mech. room. Also reveiwed all special insp. reports to date.
|