Inspections for the day of: Monday, August 25, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00548 Site Preparation8/25/20088/25/20088/25/2008 4:02:55 PMPPART
ESC permit sign posted. Needs to clean debris from around dumpster. Verbal to RP.
BLD08-01363 BLD-Footing8/25/20088/25/20088/25/2008 4:02:19 PMPPART
Eric Phone #: ###-####. Interior column pad footings for new bldg. front.
BLD08-01774 BLD-Foundation8/25/20088/25/20088/25/2008 4:01:45 PMPPART
Preston Reynolds ###-####, ###-####; late as possible. anchors for sill plate.
BLD08-00949 BLD-Final8/25/20088/25/20088/25/2008 2:43:13 PMPNR
floyd Phone #: ###-#### - please call 1/2 hr prior to inspection. Needs to post no smoking signs as per fire insp. Structure is ok. reviewed special insp. reports. ok. Contractor to post signs and recall for finals.
ESC08-00418 Site Final8/25/20088/25/20088/25/2008 2:02:37 PMPPASS
Site is clean and graded. 70% reveg ok.
BLD08-01008 BLD-Final8/25/20088/25/20088/25/2008 1:52:47 PMPPASS
ray Phone #: ###-####
BLD08-01008 DOC - Permit Finaled8/25/20088/25/20088/25/2008 1:52:38 PMPPASS
cert of occ. issued.
BLD08-00984 BLD-Final8/25/20088/25/20088/25/2008 10:51:04 AMANR
Scheduled by a contractor via Hello! on 8/25/2008 at 7:17:50 AM. Contact: ###-####. Still needs elec. and plumbing to sign perm occ.
ESC08-00490 Random Inspection8/25/20088/25/20088/25/2008 9:51:45 AMAPASS
BMP's in place. ESC permit sign posted at controlled entry point. Track out is ok.
BLD08-01210 BLD-Footing8/22/20088/25/20088/25/2008 9:50:29 AMAPASS
dale Phone #: ###-####. Mat footing for north stair tower and mech. room. Also reveiwed all special insp. reports to date.