Inspections for the day of: Monday, August 25, 2008.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01547 General Inspection8/25/20088/25/20088/26/2008 4:03:58 PMPPART
Still working on grading the project out. If not completed by 8/29/08 futher enforcement will be taken.
CAS
ESC08-00572 General Inspection8/25/20088/25/20088/26/2008 7:29:10 AMPCANC
ESC07-00987 Tracking Control8/25/20088/25/20088/25/2008 4:15:30 PMPPART
Needs to be hit a little bit better from the machine sweeping that occured. Recommend it being done by hand.
CAS
ESC08-00663 Conference8/25/20088/25/20088/25/2008 4:12:57 PMPDONE
Met with Steve, Tom D. (ACHD) and Wendy (Parks and Rec.) to address the concern of heavy sedimintated water discharging into the outfall into the boise Rive. Told Parks and Rec (Wendy) to use less water for the construction of the roads and or use secondary protection also on the d.i. with in the project area.
ESC08-00342 General Inspection8/25/20088/25/20088/25/2008 2:32:20 PMPPASS
No issues present.
ESC05-01686 Site Final8/25/20088/25/20088/25/2008 2:29:30 PMPPASS
ESC08-00495 General Inspection8/25/20088/25/20088/25/2008 2:19:17 PMPPASS
No issues. Thes site is kept very clean.
CAS
ESC07-00920 Site Final8/25/20088/25/20088/25/2008 2:15:21 PMPPASS
ESC07-00853 Site Final8/25/20088/25/20088/25/2008 2:15:09 PMPPASS
ESC07-00851 Site Final8/25/20088/25/20088/25/2008 2:14:55 PMPPASS
ESC07-00717 Site Final8/25/20088/25/20088/25/2008 2:14:41 PMPPASS
ESC04-01125 Site Final8/25/20088/25/20088/25/2008 2:14:27 PMPPASS
ESC08-00333 General Inspection8/14/20088/25/20088/25/2008 2:11:16 PMAPASS
ESC08-00369 Random Inspection8/25/20088/25/20088/25/2008 2:06:17 PMPPASS
ESC08-00577 General Inspection8/22/20088/25/20088/25/2008 2:05:42 PMPPART
Told RP to add in additional sediment protection in the north east end of project. Will be done by 9/1/08.
CAS
ESC08-00400 General Inspection8/25/20088/25/20088/25/2008 10:36:30 AMAPASS
No issues. Minor amounts of sediment on the hard surfaces. No other issues present.
CAS
ESC08-00183 Tracking Control8/11/20088/25/20088/25/2008 10:20:08 AMAFAIL
Project is not paved but curb and gutter is installed. Left a message for the RP to contact me over the schedule.
CAS
ESC08-00504 General Inspection8/25/20088/25/20088/25/2008 10:15:48 AMPPASS
site is being kept clean.
CAS
ESC08-00193 Random Inspection8/25/20088/25/20088/25/2008 9:24:15 AMAPASS
No issues present.
CAS
ESC08-00160 BMP Violation8/25/20088/25/20088/25/2008 9:00:51 AMAPASS
Entrances install to the lots. 2 were place at the north end of the project.
CAS
ESC07-00987 Tracking Control8/22/20088/25/20088/25/2008 8:49:50 AMAFAIL
no sweeping occured over the weekend. Sub contractor that was told to do it did not complete it. Wil re-inspect at the end of the day. If not completed a Notice will be issued.
CAS
ESC08-00650 Site Final8/25/20088/25/20088/25/2008 8:33:04 AMAPASS
All demo work is complete. Now starting on the ESC permit # ESC08-00464.
CAS