ESC09-00530
| Site Preparation | 8/25/2009 | 8/25/2009 | 8/25/2009 6:46:35 PM | P | PART |
|
|
Perry phone Need to post sign, Conc washout and filter in drain prior to pouring....will check at Found insp
|
BLD09-01102
| BLD-Final | 8/25/2009 | 8/25/2009 | 8/25/2009 6:43:51 PM | P | FAIL |
|
|
final on demo//Ryan ###-#### Need ESC final prior toBLD final
|
BLD09-01216
| BLD-Conference | 8/25/2009 | 8/25/2009 | 8/25/2009 3:10:00 PM | P | DONE |
|
|
Kim Phone #: ###-####
|
BLD09-01071
| BLD-Energy code compliance | 8/24/2009 | 8/25/2009 | 8/25/2009 3:09:16 PM | P | PASS |
|
|
Ray Phone #: ###-####
|
BLD08-01869
| BLD-Framing/Rough-in | 8/24/2009 | 8/25/2009 | 8/25/2009 11:39:47 AM | A | PASS |
|
|
Paul Phone #: ###-#### please call 30 min before going out
|
BLD09-00879
| BLD-Final | 8/24/2009 | 8/25/2009 | 8/25/2009 11:23:11 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/24/2009 at 1:43:00 PM. Contact: ###-####. OK for Perm Occ.
|
BLD07-02085
| BLD-Other | 8/24/2009 | 8/25/2009 | 8/25/2009 11:22:36 AM | A | NR |
|
|
suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD07-02082
| BLD-Other | 8/24/2009 | 8/25/2009 | 8/25/2009 11:22:16 AM | A | NR |
|
|
Suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD07-02083
| BLD-Other | 8/24/2009 | 8/25/2009 | 8/25/2009 11:21:55 AM | A | NR |
|
|
suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD09-00314
| BLD-Final | 8/24/2009 | 8/25/2009 | 8/25/2009 9:42:00 AM | A | NR |
|
|
Jonathan Phone #: ###-#### Need Plumb and Zoning finals
|
BLD09-01415
| BLD-Footing | 8/24/2009 | 8/25/2009 | 8/25/2009 9:35:02 AM | A | PASS |
|
|
Perry ###-####
|