FIR10-00467
| INSP-Final Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 4:01:35 PM | P | PASS |
|
|
Reinspection for the scope of work passed.
|
FIR11-00355
| INSP-Sprinkler Rough-in | 8/25/2011 | 8/25/2011 | 8/25/2011 4:00:36 PM | P | PART |
|
|
Verified corrections at the administration area and kindergarden classroom, okay to sheetrock the deck only at classrooms 113 and 115. Discussed possible obstruction issues at the soffit in rooms 113 and 115.
|
BLD11-00811
| FIRE-Final Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 3:57:41 PM | P | FAIL |
|
|
Noted items include; signage at the main entry/exit, remove manual thumbturn at the second exit, provide approved hardware at the restroom door, post fire extinguishers as discussed.
|
FIR10-00540
| INSP-Final Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 3:55:52 PM | P | PASS |
|
|
C/N items field verified for completion. Fire sprinkler permit approved for final.
|
BLD11-01939
| FIRE-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 3:54:03 PM | A | PASS |
|
|
Fire life safety final passed pending installation of approved hardware at the second exit door per plan review comments. Structural inspector to verify prior to final.
|
FIR11-00369
| INSP-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 3:51:58 PM | A | PASS |
|
|
Scope of fire sprinkler permit work finaled.
|
FIR11-00369
| INSP-Sprinkler Rough-in/Hydro | 8/25/2011 | 8/25/2011 | 8/25/2011 3:50:58 PM | P | CANC |
|
|
OH rough-in approved for cover.
|