BLD11-00610
| FIRE-Conference | 8/17/2011 | 8/22/2011 | | A | |
|
|
Troy-call Dixie for am meeting
|
BLD11-00781
| FIRE-Conference | 8/25/2011 | 8/25/2011 | 8/25/2011 3:39:06 PM | P | DONE |
|
|
Went over racking issues with Chris Palmer
|
FIR11-00426
| INSP-Sprinkler Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 2:01:47 PM | P | PASS |
|
|
Rough-in passed
|
BLD11-01104
| FIRE-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 12:25:07 PM | A | FAIL |
|
|
Provide a manual fire alarm system. Provide tagged and mounted fire extinguisher as discussed. Applicant needs to meet with the plan reviewer to discuss which two exits will be the required exits. This will drive number of exit signs and their locations as well as the panic hardware requirement and landing requirements. Emergency lighting needs to be provided through out. Smoke alarms need to be tested. Address numbers have been painted. Receptical covers need to be provided. See the city approved plans/review notes for items marked in red that need to be addressed.
|
FIR11-00095
| INSP-Supply line flush | 8/24/2011 | 8/25/2011 | 8/25/2011 12:04:57 PM | A | PASS |
|
|
Underground supply line flush passed.
|
FIR11-00159
| INSP-Final Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 11:46:47 AM | P | FAIL |
|
|
Forward flush passed. This project can be finaled when the tamper switches on the wet system are reporting to the central station.
|
MIS11-00216
| FIR-Conference | 8/25/2011 | 8/25/2011 | 8/25/2011 11:44:15 AM | P | DONE |
|
|
I posted a "stop work order" on site after I found two small rooms being built upstairs in the gym area.Wood framed walls, electrical work, mechanical work and fire alarm work has been performed. The mechanical work incudes ducting and a chase/soffit through the second floor exit stairway to the exterior of the building.
|
FIR11-00330
| INSP-Supply line flush | 8/24/2011 | 8/25/2011 | 8/25/2011 11:38:24 AM | A | CANC |
|
|
Could not do underground flush due to United Water
|
FIR11-00330
| INSP-Sprinkler Rough-in/Hydro | 8/24/2011 | 8/25/2011 | 8/25/2011 11:37:39 AM | P | PASS |
|
|
Overhead hydro test passed.
|
BLD11-00101
| FIRE-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 10:44:42 AM | A | CANC |
|
|
This is a duplicate inspection that was set up for inspection performed 8/24/2011
|
FIR11-00095
| INSP-Sprinkler Rough-in/Hydro | 8/24/2011 | 8/25/2011 | 8/25/2011 10:29:18 AM | A | PASS |
|
|
The underground supply line hydro test passed.
|
BLD11-00859
| FIRE-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 9:03:54 AM | A | PASS |
|
|
life safety passed.
|
FIR11-00427
| INSP-Sprinkler Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 8:50:46 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|