BLD11-01652
| BLD-Conference | 8/24/2011 | 8/25/2011 | 8/25/2011 4:15:52 PM | P | DONE |
|
|
As late as possible Phone #: 2088705411 >> Inspection requested via mobile web by Todd Buhler. WIll need to have third party look at welding.
|
BLD10-02069
| BLD-Concrete | 8/25/2011 | 8/25/2011 | 8/25/2011 3:39:09 PM | P | PART |
|
|
ricardo - ###-####. Work in progress on drilled piers south end, special inspector on site. Aslo inspected the nearly completed interior footings for existing columns that were moved to gridline 15.6 and remainder of column footing work on grid 25.5.
|
ESC10-00670
| Random Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 3:36:38 PM | P | PASS |
|
|
|
BLD11-01575
| BLD-Framing/Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 3:11:05 PM | P | NR |
|
|
steve Phone #: ###-####. Needs to pull and get electrical rough in inspection.
|
ESC11-00463
| General Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 3:10:20 PM | P | PASS |
|
|
|
BLD11-00366
| BLD-Final | 8/24/2011 | 8/25/2011 | 8/25/2011 1:33:52 PM | P | NR |
|
|
steve - please call 1/2 hr prior Phone #: ###-####. Needs fire/life/safety final.
|
ESC11-00277
| BMP Violation | 8/25/2011 | 8/25/2011 | 8/25/2011 10:59:58 AM | A | FAIL |
|
|
Nededs to pick up all blowable trash. Correction notice posted.
|
BLD11-00984
| BLD-Framing/Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 10:59:20 AM | A | FAIL |
|
|
Adam Phone #: ###-####. Provide portal framing at garage and den as per detail 5 on sheet A5.1 on approved plans, knee wall on bonus room trusses need to be encapsulated on all six sides. Correction notice posted. Do not insulate.
|
BLD11-01808
| DOC - Permit Finaled | 8/25/2011 | 8/25/2011 | 8/25/2011 8:03:21 AM | P | PASS |
|
|
All work appeared to be done in acordance with local codes and ordinances.
|
ESC11-00306
| Aging Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 8:02:29 AM | | PASS |
|
|
Work is in progress.
|