Inspections for the day of: Thursday, August 25, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-01652 BLD-Conference8/24/20118/25/20118/25/2011 4:15:52 PMPDONE
As late as possible Phone #: 2088705411 >> Inspection requested via mobile web by Todd Buhler. WIll need to have third party look at welding.
BLD10-02069 BLD-Concrete8/25/20118/25/20118/25/2011 3:39:09 PMPPART
ricardo - ###-####. Work in progress on drilled piers south end, special inspector on site. Aslo inspected the nearly completed interior footings for existing columns that were moved to gridline 15.6 and remainder of column footing work on grid 25.5.
ESC10-00670 Random Inspection8/25/20118/25/20118/25/2011 3:36:38 PMPPASS
BLD11-01575 BLD-Framing/Rough-in8/24/20118/25/20118/25/2011 3:11:05 PMPNR
steve Phone #: ###-####. Needs to pull and get electrical rough in inspection.
ESC11-00463 General Inspection8/25/20118/25/20118/25/2011 3:10:20 PMPPASS
BLD11-00366 BLD-Final8/24/20118/25/20118/25/2011 1:33:52 PMPNR
steve - please call 1/2 hr prior Phone #: ###-####. Needs fire/life/safety final.
ESC11-00277 BMP Violation8/25/20118/25/20118/25/2011 10:59:58 AMAFAIL
Nededs to pick up all blowable trash. Correction notice posted.
BLD11-00984 BLD-Framing/Rough-in8/24/20118/25/20118/25/2011 10:59:20 AMAFAIL
Adam Phone #: ###-####. Provide portal framing at garage and den as per detail 5 on sheet A5.1 on approved plans, knee wall on bonus room trusses need to be encapsulated on all six sides. Correction notice posted. Do not insulate.
BLD11-01808 DOC - Permit Finaled8/25/20118/25/20118/25/2011 8:03:21 AMPPASS
All work appeared to be done in acordance with local codes and ordinances.
ESC11-00306 Aging Inspection8/25/20118/25/20118/25/2011 8:02:29 AM PASS
Work is in progress.