FIR14-00459
| INSP-Final Inspection | 8/25/2014 | 8/25/2014 | 8/25/2014 2:57:57 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR14-00459
| INSP-Sprinkler Rough-in | 8/25/2014 | 8/25/2014 | 8/25/2014 2:57:15 PM | P | PART |
|
|
Rough-in and scope of fire sprinkler modifications completed and passed inspection.
|
FIR14-00345
| INSP-Sprinkler Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 2:55:21 PM | A | PART |
|
|
Verified remainder of overhead work for cover at the grid ceilings throughout. Adjustments to coverage in the north and south hallways okayed.
|
FIR14-00261
| INSP-Sprinkler Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 2:53:09 PM | A | PART |
|
|
Completed rough-in inspection for the third floor level apartment units. One missing head added while on site, upright at the mech/electrical closet okayed, need to relocate branchline at the SE unit away from metal edge at beam. Expansion joint needs finished. Plan mod required for changes to sprinkler coverage at the stairways all levels.
|