FIR15-00356
| INSP-Sprinkler Rough-in/Hydro | 8/25/2015 | 8/25/2015 | 8/25/2015 3:27:50 PM | P | PASS |
|
|
Overhead rough-in for the wet and dry systems passed. A plan modification is needed for the below mezzanine piping due to additional fittings on the main and an additional branchline. Overhead hydro tests passed on both the wet and dry systems. 24 hour air test started on the dry system with 47 psi on the guage at 3:00 pm.
|
BLD11-01878
| FIRE-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 2:23:28 PM | P | PASS |
|
|
Life safety passed
|
FIR15-00581
| INSP-Sprinkler Rough-in | 8/25/2015 | 8/25/2015 | 8/25/2015 2:22:56 PM | P | PASS |
|
|
rough-in passed. piping can be covered.
|
BLD14-02412
| FIRE-Final Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 12:46:27 PM | P | FAIL |
|
|
Need project related fire alarm permit finaled, Need exit discharge at two exits and a fire extinguisher in the basement.
|
FIR14-00803
| INSP-Final Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 10:40:58 AM | P | FAIL |
|
|
See the city approved plans for corrections needed which include as-builts, add notification, test hvac units, relocated manual pull station and repair strobe.
|
FIR15-00539
| INSP-Final Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 10:30:16 AM | P | PASS |
|
|
Permit finaled. system is on line
|
FIR15-00253
| INSP-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 10:29:02 AM | A | PASS |
|
|
Permit finaled
|
BLD15-00493
| FIRE-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 8:52:41 AM | A | FAIL |
|
|
Need knox box, address/suite #, and fire extinguishers.
|
FIR15-00583
| INSP-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 8:52:00 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00471
| INSP-Sprinkler Rough-in | 8/24/2015 | 8/25/2015 | 8/25/2015 8:51:59 AM | P | CANC |
|
|
Bryan is the contact. Concrete is coming at 12pm. Please contact Bryan for scheduling. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR15-00353
| INSP-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 8:51:41 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00361
| INSP-Final Inspection | 8/24/2015 | 8/25/2015 | 8/25/2015 8:50:46 AM | A | PASS |
|
|
Permit finaled
|