FIR15-00356 INSP-Sprinkler Rough-in/Hydro8/25/20158/25/20158/25/2015 3:27:50 PMPPASS
Overhead rough-in for the wet and dry systems passed. A plan modification is needed for the below mezzanine piping due to additional fittings on the main and an additional branchline. Overhead hydro tests passed on both the wet and dry systems. 24 hour air test started on the dry system with 47 psi on the guage at 3:00 pm.
BLD11-01878 FIRE-Final Inspection8/24/20158/25/20158/25/2015 2:23:28 PMPPASS
Life safety passed
FIR15-00581 INSP-Sprinkler Rough-in8/25/20158/25/20158/25/2015 2:22:56 PMPPASS
rough-in passed. piping can be covered.
BLD14-02412 FIRE-Final Inspection8/25/20158/25/20158/25/2015 12:46:27 PMPFAIL
Need project related fire alarm permit finaled, Need exit discharge at two exits and a fire extinguisher in the basement.
FIR14-00803 INSP-Final Inspection8/25/20158/25/20158/25/2015 10:40:58 AMPFAIL
See the city approved plans for corrections needed which include as-builts, add notification, test hvac units, relocated manual pull station and repair strobe.
FIR15-00539 INSP-Final Inspection8/25/20158/25/20158/25/2015 10:30:16 AMPPASS
Permit finaled. system is on line
FIR15-00253 INSP-Final Inspection8/24/20158/25/20158/25/2015 10:29:02 AMAPASS
Permit finaled
BLD15-00493 FIRE-Final Inspection8/24/20158/25/20158/25/2015 8:52:41 AMAFAIL
Need knox box, address/suite #, and fire extinguishers.
FIR15-00583 INSP-Final Inspection8/24/20158/25/20158/25/2015 8:52:00 AMAPASS
Permit finaled
FIR15-00471 INSP-Sprinkler Rough-in8/24/20158/25/20158/25/2015 8:51:59 AMPCANC
Bryan is the contact. Concrete is coming at 12pm. Please contact Bryan for scheduling. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR15-00353 INSP-Final Inspection8/24/20158/25/20158/25/2015 8:51:41 AMAPASS
Permit finaled
FIR15-00361 INSP-Final Inspection8/24/20158/25/20158/25/2015 8:50:46 AMAPASS
Permit finaled