ESC15-00105
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 4:56:00 PM | | PASS |
|
|
To become future construction site. No issues, will keep open while area is still disturbed with no stabilzation.
|
ESC15-00177
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 4:55:37 PM | | PASS |
|
|
|
ESC14-00662
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 4:53:13 PM | | PASS |
|
|
No activity. No changes to site. Revegetating.
|
ESC15-00789
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 3:40:05 PM | P | PASS |
|
|
No activity currently at the Afton site. All demolished materials have been removed . Site is surrounded by security fence and receiving DIs have inlet sediment capture bags. No wind blown dust issues observed at time of inspection.
|
ESC14-00928
| Random Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 3:36:49 PM | P | PASS |
|
|
WIP on 10th and Grove Condos. Site grading and foundation construction is complete (covered under ESC14-00713).
No discharges or significant amounts of loose sediment leaving site. Stormdrain has inlet filter bag installed.
|
ESC15-00782
| Random Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 3:14:54 PM | P | PASS |
|
|
WIP on demo and remodel of One-Eleven Broadway. No trackout or discharges from work. Permit sign is clearly posted. No fugitive construction dust observed. Approved.
|
ESC15-00973
| Site Preparation | 8/24/2015 | 8/25/2015 | 8/25/2015 3:07:58 PM | P | PASS |
|
|
Cameron Phone #: ###-####
Permit sign posted. Streets and gutters in Trailwind Sub are free of loose sediment and trackout from sites. Private stormdrain behind house and DI bag installed.
Approved to excavate.
|
ESC14-01145
| Aging Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 2:46:38 PM | | PASS |
|
|
Home complete, landscaped, and occupied. ESC permit conditions satisfied.
|
ESC14-01145
| DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 2:46:01 PM | P | PASS |
|
|
|
ESC14-00239
| Site Final | 8/24/2015 | 8/25/2015 | 8/25/2015 2:33:10 PM | A | PASS |
|
|
Exterior construction and site improvements are complete. Landscaping has been installed, streets, and gutters have been swept. DI bags in stormdrains surround building have been removed.
ESC permit conditions satisfied. Permit finaled.
|
ESC14-00239
| DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 2:31:16 PM | P | PASS |
|
|
|
ESC14-01124
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 2:02:31 PM | | PASS |
|
|
|
ESC15-00033
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 1:02:44 PM | | PASS |
|
|
WIP on new Honda dealership building. All perimeter roads (Gratz & Auto), stormwater infrastructure , and currently under construction. No fugitive dust issues, no trackout to paved streets.
No corrections at this time.
|
ESC15-00955
| Complaint Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 12:44:07 PM | P | PART |
|
|
Trackout complaint received.
Trackout is occuring onto Maple Grove to the bike lane and slightly into the southbound traffic lane. The trackout issue is due to fugitive dust control efforts by water truck, which is more of a priority at this time.
Correction issued to onsite supervisor Brent to turn over rocks in construction entrance and sweep up bike lane area (which is to be closed by ACHD).
|
ESC15-00049
| Aging Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 11:54:10 AM | | PASS |
|
|
No construction activity at site. No loose sediment leaving site. No further ESC inspections necessary. Permit closed. BLD open...
|
ESC15-00049
| DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 11:50:10 AM | P | PASS |
|
|
|
ESC15-00507
| Site Final | 8/25/2015 | 8/25/2015 | 8/25/2015 11:02:54 AM | A | NR |
|
|
Construction is complete and yard has been landscaped/stabilized with sod.
Correction: - defective sprinkler along front is wash sediment out on to street and gutter.
- need to fix sprinkler system, sweep up sidewalk/gutter. Empty out DI bag and reinstall on north side of Dunham.
|
ESC15-00727
| Site Preparation | 8/24/2015 | 8/25/2015 | 8/25/2015 10:59:39 AM | A | PASS |
|
|
Brett Phone #: ###-####
Permit sign posted. Streets and gutters in Dunham Commons are clean. Will need to remove old washout pit and provide new contaiment for remaining projects.
Active CBH projects in compliance. Approved to start new SFH.
|
ESC15-00814
| Site Preparation | 8/24/2015 | 8/25/2015 | 8/25/2015 10:59:21 AM | A | PASS |
|
|
Brett Phone #: ###-####
Permit sign posted. Streets and gutters in Dunham Commons are clean. Will need to remove old washout pit and provide new contaiment for remaining projects.
Active CBH projects in compliance. Approved to start new SFH.
|
ESC15-00106
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 10:00:19 AM | | PASS |
|
|
|
ESC14-00356
| General Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 8:44:32 AM | | PASS |
|
|
WIP on SFH. No trackout or loose dirt leaving site. Staying within clearing limits. Trash and materials are contained. No corrections.
|