Inspections for the day of: Tuesday, August 25, 2015.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00105 General Inspection8/25/20158/25/20158/25/2015 4:56:00 PM PASS
To become future construction site. No issues, will keep open while area is still disturbed with no stabilzation.
ESC15-00177 General Inspection8/25/20158/25/20158/25/2015 4:55:37 PM PASS
ESC14-00662 General Inspection8/25/20158/25/20158/25/2015 4:53:13 PM PASS
No activity. No changes to site. Revegetating.
ESC15-00789 General Inspection8/25/20158/25/20158/25/2015 3:40:05 PMPPASS
No activity currently at the Afton site. All demolished materials have been removed . Site is surrounded by security fence and receiving DIs have inlet sediment capture bags. No wind blown dust issues observed at time of inspection.

ESC14-00928 Random Inspection8/25/20158/25/20158/25/2015 3:36:49 PMPPASS
WIP on 10th and Grove Condos. Site grading and foundation construction is complete (covered under ESC14-00713).

No discharges or significant amounts of loose sediment leaving site. Stormdrain has inlet filter bag installed.
ESC15-00782 Random Inspection8/25/20158/25/20158/25/2015 3:14:54 PMPPASS
WIP on demo and remodel of One-Eleven Broadway. No trackout or discharges from work. Permit sign is clearly posted. No fugitive construction dust observed. Approved.
ESC15-00973 Site Preparation8/24/20158/25/20158/25/2015 3:07:58 PMPPASS
Cameron Phone #: ###-####

Permit sign posted. Streets and gutters in Trailwind Sub are free of loose sediment and trackout from sites. Private stormdrain behind house and DI bag installed.

Approved to excavate.
ESC14-01145 Aging Inspection8/25/20158/25/20158/25/2015 2:46:38 PM PASS
Home complete, landscaped, and occupied. ESC permit conditions satisfied.
ESC14-01145 DOC - Permit Finaled8/25/20158/25/20158/25/2015 2:46:01 PMPPASS
ESC14-00239 Site Final8/24/20158/25/20158/25/2015 2:33:10 PMAPASS
Exterior construction and site improvements are complete. Landscaping has been installed, streets, and gutters have been swept. DI bags in stormdrains surround building have been removed.

ESC permit conditions satisfied. Permit finaled.
ESC14-00239 DOC - Permit Finaled8/25/20158/25/20158/25/2015 2:31:16 PMPPASS
ESC14-01124 General Inspection8/25/20158/25/20158/25/2015 2:02:31 PM PASS
ESC15-00033 General Inspection8/25/20158/25/20158/25/2015 1:02:44 PM PASS
WIP on new Honda dealership building. All perimeter roads (Gratz & Auto), stormwater infrastructure , and currently under construction. No fugitive dust issues, no trackout to paved streets.

No corrections at this time.
ESC15-00955 Complaint Inspection8/25/20158/25/20158/25/2015 12:44:07 PMPPART
Trackout complaint received.

Trackout is occuring onto Maple Grove to the bike lane and slightly into the southbound traffic lane.
The trackout issue is due to fugitive dust control efforts by water truck, which is more of a priority at this time.

Correction issued to onsite supervisor Brent to turn over rocks in construction entrance and sweep up bike lane area (which is to be closed by ACHD).
ESC15-00049 Aging Inspection8/25/20158/25/20158/25/2015 11:54:10 AM PASS
No construction activity at site. No loose sediment leaving site. No further ESC inspections necessary. Permit closed. BLD open...
ESC15-00049 DOC - Permit Finaled8/25/20158/25/20158/25/2015 11:50:10 AMPPASS
ESC15-00507 Site Final8/25/20158/25/20158/25/2015 11:02:54 AMANR
Construction is complete and yard has been landscaped/stabilized with sod.

Correction:
- defective sprinkler along front is wash sediment out on to street and gutter.

- need to fix sprinkler system, sweep up sidewalk/gutter. Empty out DI bag and reinstall on north side of Dunham.
ESC15-00727 Site Preparation8/24/20158/25/20158/25/2015 10:59:39 AMAPASS
Brett Phone #: ###-####


Permit sign posted. Streets and gutters in Dunham Commons are clean. Will need to remove old washout pit and provide new contaiment for remaining projects.

Active CBH projects in compliance. Approved to start new SFH.
ESC15-00814 Site Preparation8/24/20158/25/20158/25/2015 10:59:21 AMAPASS
Brett Phone #: ###-####

Permit sign posted. Streets and gutters in Dunham Commons are clean. Will need to remove old washout pit and provide new contaiment for remaining projects.

Active CBH projects in compliance. Approved to start new SFH.
ESC15-00106 General Inspection8/25/20158/25/20158/25/2015 10:00:19 AM PASS
ESC14-00356 General Inspection8/25/20158/25/20158/25/2015 8:44:32 AM PASS
WIP on SFH. No trackout or loose dirt leaving site. Staying within clearing limits. Trash and materials are contained. No corrections.