ELE13-02304
| Final | 8/25/2016 | 8/25/2016 | 8/25/2016 3:37:46 PM | P | FAIL |
|
|
110.3- Unable to confirm listing
|
ELE16-02684
| Final | 8/25/2016 | 8/25/2016 | 8/25/2016 3:33:51 PM | P | PASS |
|
|
Texans said they will not be home until 3pm , I have no contact number to call but the owner of the property told me 3pm or after. Phone #: ###-#### Inspection requested via web by Greg Traudt Final ok
|
ELE12-02998
| ELE-Aging Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 2:53:57 PM | | PASS |
|
|
Waiting on owner
|
ELE12-03157
| ELE-Aging Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 2:53:34 PM | | PASS |
|
|
Waiting on contractor
|
ELE16-02784
| Conference | 8/25/2016 | 8/25/2016 | 8/25/2016 2:39:04 PM | P | DONE |
|
|
Scott Phone #: ###-#### Discussed the installation of underground from main service mounted on a pole to an interior wall of house. 18" minimum, under footing then reduce depth where under concrete floor. 360 degrees of bend max and grounding electode required. Owner talked about hiring contractor to wire house with foam panel walls.
|
ELE16-02397
| Electrical Rough-In | 8/25/2016 | 8/25/2016 | 8/25/2016 2:01:38 PM | P | CANC |
|
|
Call half hour before to meet there // James Phone #: ###-#### Needed permanent service inspection
|
ELE16-02397
| Permanent Service | 8/25/2016 | 8/25/2016 | 8/25/2016 2:01:24 PM | P | PASS |
|
|
Call half hour before to meet there // James Phone #: ###-#### p/s o/h rec ok
|
ELE16-02778
| Electrical Rough-In | 8/24/2016 | 8/25/2016 | 8/25/2016 1:08:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean Wall rough in ok cover
|
ELE15-00495
| Electrical Rough-In | 8/24/2016 | 8/25/2016 | 8/25/2016 11:39:42 AM | A | PASS |
|
|
Inspect fire corridor walls and ceiling for cover first floor GBAD by stair 5. Contact is Mark Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves 2nd floor breezeway hardlid and 1st floor GBAD emergency corridor hardlid and walls rough in ok cover
|
ELE16-00089
| Electrical Rough-In | 8/24/2016 | 8/25/2016 | 8/25/2016 11:38:25 AM | A | PASS |
|
|
Call Bob for inspection of ceiling grid areas in Clearwater building and structural documentation for chandelier on 4th floor above escalator. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas grid 413 except exit, 418, 419, 420, 421 and cloud hardlid rough in ok cover
|
ELE16-02769
| Electrical Rough-In | 8/24/2016 | 8/25/2016 | 8/25/2016 10:03:15 AM | A | DONE |
|
|
electrical inspection/consultation please. Thank you. Phone #: ###-#### Inspection requested via web by Kyle Lott Conference only at this time. Discussed type of NEC code would apply to mixed use structure. Zoned R-OD residential and or office. Residential codes apply to all rooms
|
ELE16-02768
| Temporary Service | 8/24/2016 | 8/25/2016 | 8/25/2016 8:31:42 AM | A | PASS |
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren t/s u/g n ok
|
ELE16-02654
| Electrical Rough-In | 8/24/2016 | 8/25/2016 | 8/24/2016 12:03:48 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by kendall bender Inspection cancelled from web by: kendall bender
|