BLD16-01022
| BLD-Final | 8/25/2016 | 8/25/2016 | 8/26/2016 9:48:14 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD14-03081
| BLD-Framing/Rough-in | 8/24/2016 | 8/25/2016 | 8/25/2016 4:07:35 PM | P | PART |
|
|
Scott Phone #: ###-####.penetrations in floor assembily. OK to insulate.
|
BLD16-00316
| BLD-Framing/Rough-in | 8/24/2016 | 8/25/2016 | 8/25/2016 2:10:15 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Provide Engineered fix for truss h3 and floor joist with broken bottom cord.
|
GCB15-00090
| GCB-Energy | 8/24/2016 | 8/25/2016 | 8/25/2016 10:43:44 AM | A | PASS |
|
|
Chris ###-#### - requested call ahead - south 1/2 of 1st floor except popouts east side of the building.
|
GCB15-00069
| GCB-Final | 8/24/2016 | 8/25/2016 | 8/25/2016 9:48:33 AM | A | PASS |
|
|
Tim ###-####. Structural final only
|
BLD16-00635
| BLD-Framing/Rough-in | 8/24/2016 | 8/25/2016 | 8/24/2016 12:39:33 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni
|