BLD17-03018
| BLD-Framing/Rough-in | 8/25/2017 | 8/25/2017 | 8/25/2017 3:11:48 PM | P | PASS |
|
|
Russ Phone #: ###-#### need backfill for final exterior insp only left
|
MIS17-00275
| BLD-Conference | 8/25/2017 | 8/25/2017 | 8/25/2017 3:10:57 PM | P | FAIL |
|
|
need building permit
|
BLD16-02103
| BLD-Aging Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 3:09:56 PM | | NR |
|
|
ncfi exp 101017
|
BLD17-01657
| BLD-Framing/Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 2:28:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nancy Frost
|
BLD16-03608
| BLD-Framing/Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 12:09:50 PM | A | PART |
|
|
Rory Phone #: ###-#### ok to insulate/ check ceilling to mlb.
|
BLD17-01100
| BLD-Framing/Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 12:08:58 PM | A | NR |
|
|
Andy Phone #: ###-####
|
BLD17-01100
| BLD-Energy code compliance | 8/24/2017 | 8/25/2017 | 8/25/2017 12:08:37 PM | A | NR |
|
|
Andy Phone #: ###-####
|
BLD17-00102
| BLD-Conference | 8/25/2017 | 8/25/2017 | 8/25/2017 9:50:40 AM | A | PASS |
|
|
walk thru prep for final/ landings doors/equment tie down boliers
|