Inspections for the day of: Friday, August 25, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00397 INSP-Final Inspection8/24/20178/25/20178/25/2017 2:28:24 PMAPASS
Permit finaled. Another permit is required for System #2 as per our discussion.
Dave Phone #: ###-####
FIR17-00465 INSP-Sprinkler Rough-in8/24/20178/25/20178/25/2017 1:58:58 PMAPASS
The In Building Riser (5'-0") stub out is ok to cover. I spoke to the fitter and the job site superintendant about my concerns for proper bury depth of the remaining piping when installed.
FIR17-00001 INSP-Final Inspection8/25/20178/25/20178/25/2017 1:49:20 PMPCANC
Cancel per Anthony. I could not make it to the project site when Anthony needed me to meet.
FIR17-00217 INSP-Sprinkler Rough-in/Hydro8/25/20178/25/20178/25/2017 1:49:08 PMPCANC
Cancel per Anthony. I could not make it to the project site when Anthony needed me to meet.
FIR17-00030 INSP-Sprinkler Rough-in/Hydro8/23/20178/25/20178/25/2017 1:42:28 PMACANC
The fitter and I could not make it to the inspection at the same time. Agreed to re-schedule for monday morning
FIR17-00231 INSP-Sprinkler Rough-in8/25/20178/25/20178/25/2017 1:36:53 PMAPASS
Inspection for remaining underground to property line passed. Piping can be covered.
BLD16-03010 FIRE-Final Inspection8/25/20178/25/20178/25/2017 1:16:38 PMPPART
A temp on life safety is being given until the access controled egress door is fully functional. All other items appear ok.
FIR17-00017 INSP-Final Inspection8/24/20178/25/20178/25/2017 1:15:17 PMAPASS
Permit finaled
FIR14-00205 INSP-Sprinkler Rough-in/Hydro8/24/20178/25/20178/25/2017 11:28:59 AMAPASS
The underground supply hydro test passed
FIR17-00299 INSP-Final Inspection8/24/20178/25/20178/25/2017 9:54:32 AMAPASS
Permit finaled
NAF17-00023 INSP-Final8/24/20178/25/20178/25/2017 9:47:08 AMADONE
permit finaled
NAF17-00040 INSP-Final8/24/20178/25/20178/25/2017 8:45:38 AMAPART
A partial final is being given with the fire dept's approval until the fire sprinkler system issue has been resolved as per the previous comments and emails
BLD17-00710 FIRE-Final Inspection8/24/20178/25/20178/25/2017 8:22:30 AMAFAIL
Need the project related fire sprinkler permit addressed, need door hardware installed, exit signs and emergency lights tested, fire extinguishers mounted, suite number mounted
FIR17-00277 INSP-Final Inspection8/24/20178/25/20178/25/2017 7:43:50 AMAPASS
permit finaled. Drawings were basic and did not match installation. I verified compliance in new scope of work and sync.