BLD02-01816
| BLD-Final | 8/23/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | A | FAIL |
|
|
###-#### MIKE smoke seal/ p&z sing off 8/26/2002 9:34:53 AM
|
BLD02-01583
| BLD-Framing/Rough-in | 8/25/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/25/2002 at 12:25:58. Contact: ###-####.maintane 1 hr ceilling or wall behind fur out wall at exit. 8/26/2002 9:36:54 AM
|
BLD02-01865
| BLD-Final | 8/26/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | A | FAIL |
|
|
1. ATTIC VENTILATION - Enclosed attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain and snow. The net free ventilating area shall not be less than 1/150 of the area of the space ventilated. The openings shall be covered with corrosion-resistant metal mesh with mesh openings of 1/4 inch in dimension. 1994 UBC 1505.3 See limited exceptions.
|
BLD02-02018
| BLD-Footing | 8/25/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 08/25/2002 at 20:34:37. Contact: ###-####.
|
MEC02-02303
| Pressure Test | 8/26/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | P | PASS |
|
|
###-#### michael
|
BLD02-01856
| BLD-Footing | 8/26/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | P | PART |
|
|
###-#### ###-####appears to be ok for ft and rebar unable to locate plans or contact person on phone # given. 8/26/2002 2:25:22 PM
|
BLD02-01750
| BLD-Final | 8/26/2002 | 8/26/2002 | 8/26/2002 12:00:00 AM | P | FAIL |
|
|
###-#### not a b occ. need new permit from plan review to justafy e3 occ. 8/26/2002 2:04:38 PM
|