Inspections for the day of: Tuesday, August 26, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00575 BLD-Framing/Rough-in8/26/20088/26/20088/26/2008 5:30:03 PMPPASS
val Phone #: ###-####
BLD08-01724 BLD-Concrete8/26/20088/26/20088/26/2008 5:29:45 PMPPASS
Wes Phone #: ###-####
MIS08-00089 BLD-Final8/26/20088/26/20088/26/2008 3:42:43 PMPPEND
Boise City Housing Rehab WIP
BLD08-00722 BLD-Final8/26/20088/26/20088/26/2008 3:03:29 PMPNR
Tobi Norton ###-#### Ext 338
WIP
BLD08-00234 BLD-Wall cover8/25/20088/26/20088/26/2008 2:30:49 PMPPASS
Scheduled by a contractor via Hello! on 8/25/2008 at 4:53:18 PM. Contact: ###-####.
Roof framing OK
BLD08-00234 BLD-Framing/Rough-in8/26/20088/26/20088/26/2008 2:28:37 PMPPART
Scheduled by ###-####
OK to totally fill roof joist bays in leiu of installing sprinklers.....roof framing ok
BLD08-00560 BLD-Footing8/25/20088/26/20088/26/2008 11:44:45 AMAPART
paul Phone #: ###-####
Not finished forming
BLD08-00234 BLD-Energy code compliance8/26/20088/26/20088/26/2008 10:10:14 AMAPART
Scheduled by a contractor via Hello! on 8/26/2008 at 6:46:22 AM. Contact: ###-####.
1st floor select Ext. walls
BLD07-02877 BLD-Conference8/25/20088/26/20088/26/2008 8:50:05 AMAPEND
Linda Phone #: ###-####
Met with home owners..... they showed concern about concrete contractor that lost Bsmnt. foundation wall while placing concrete. Contractor shored wall forms back up and continued to pour sometime later. This created a cold joint. While installing new water line adjacent to wall in question (S. W. corner of new addition) owners noticed water seeping inside through cold joint. I commented on the need to seek advice from Stuctural Engineer for a fix.