BLD08-00093
| BLD-Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 12:00:00 AM | A | DONE |
|
|
Final grading and drainage approved
|
MIS08-00056
| Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 12:00:00 AM | P | DONE |
|
|
Grading is complete and approved
|
BLD07-02993
| BLD-Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 12:00:00 AM | P | BOND |
|
|
The grading and drainage has been completed at the above mentioned address. However, the approved grading plan was not followed and the applicant must be granted approval from Planning and Zoning for the retaining walls that were built. A $2,500.00 bond is required to regrade the site if the walls are not approved.
|
BLD06-00607
| BLD-Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 12:00:00 AM | P | DONE |
|
|
FINAL GRADING AND DRAINAGE APPROVED
|