BLD09-00786
| BLD-Aging Inspection | 8/26/2009 | 8/26/2009 | 8/28/2009 1:47:34 PM | | PASS |
|
|
|
BLD09-00782
| BLD-Aging Inspection | 8/26/2009 | 8/26/2009 | 8/27/2009 12:17:50 PM | P | PEND |
|
|
|
BLD09-01364
| BLD-Footing | 8/25/2009 | 8/26/2009 | 8/26/2009 3:17:45 PM | P | PART |
|
|
Jay Phone #: ###-####
|
BLD09-01393
| BLD-Footing | 8/26/2009 | 8/26/2009 | 8/26/2009 3:16:50 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/26/2009 at 9:42:45 AM. Contact: ###-####. 4 of the 5 basement ftgs ok,, anop
|
BLD09-00785
| BLD-Aging Inspection | 8/26/2009 | 8/26/2009 | 8/26/2009 2:49:06 PM | P | PEND |
|
|
|
BLD09-00786
| BLD-Aging Inspection | 8/26/2009 | 8/26/2009 | 8/26/2009 2:17:39 PM | P | PASS |
|
|
|
ESC09-00512
| Site Preparation | 8/26/2009 | 8/26/2009 | 8/26/2009 2:15:05 PM | P | FAIL |
|
|
need a wash out area prior to pouring,, left RP a messege
|
ESC09-00534
| Site Preparation | 8/26/2009 | 8/26/2009 | 8/26/2009 1:52:11 PM | P | FAIL |
|
|
c/n posted on back of permit card
|
BLD09-01063
| BLD-Final | 8/25/2009 | 8/26/2009 | 8/26/2009 11:19:34 AM | A | FAIL |
|
|
Preston Phone #: ###-#### need zoning 1st,, also need handrails
|
BLD09-01278
| BLD-Final | 8/25/2009 | 8/26/2009 | 8/26/2009 11:13:41 AM | A | PASS |
|
|
|
BLD09-01278
| DOC - Permit Finaled | 8/26/2009 | 8/26/2009 | 8/26/2009 11:13:29 AM | P | PASS |
|
|
|
BLD09-01419
| BLD-Footing | 8/25/2009 | 8/26/2009 | 8/26/2009 10:24:47 AM | A | PART |
|
|
request around 10am//Brian Phone #: ###-####// wip,, ESC fails,, c/n posted on back of inspection card,, ok to pour after fixes
|