FIR08-00239
| INSP-Sprinkler Rough-in | 8/26/2011 | 8/26/2011 | 8/29/2011 2:37:47 PM | P | PART |
|
|
Verified trash chute protection at building #2 and #3 2nd and 4th floors.
|
BLD11-00718
| FIRE-Final Inspection | 8/24/2011 | 8/26/2011 | 8/26/2011 5:02:11 PM | A | DEFR |
|
|
|
BLD11-00544
| FIRE-Final Inspection | 8/25/2011 | 8/26/2011 | 8/26/2011 5:01:26 PM | A | DEFR |
|
|
|
BLD11-01434
| FIRE-Final Inspection | 8/26/2011 | 8/26/2011 | 8/26/2011 4:52:18 PM | P | PASS |
|
|
Fire life safety completed acceptable.
|
FIR11-00429
| INSP-Final Inspection | 8/26/2011 | 8/26/2011 | 8/26/2011 4:50:03 PM | P | PASS |
|
|
Reinspection passed. Fire alarm permit finaled.
|
FIR11-00390
| INSP-Final Inspection | 8/24/2011 | 8/26/2011 | 8/26/2011 4:48:23 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR11-00368
| INSP-Final Inspection | 8/24/2011 | 8/26/2011 | 8/26/2011 4:46:50 PM | P | PASS |
|
|
Site inspection and functional testing passed. Scope of work complete. Permit finaled.
|
FIR11-00346
| INSP-Final Inspection | 8/25/2011 | 8/26/2011 | 8/26/2011 4:43:59 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
BLD08-01071
| FIRE-Final Inspection | 8/26/2011 | 8/26/2011 | 8/26/2011 4:42:18 PM | P | PASS |
|
|
Unit 531 life safety passed.
|
FIR11-00413
| INSP-Sprinkler Rough-in | 8/25/2011 | 8/26/2011 | 8/26/2011 4:32:11 PM | A | PART |
|
|
Overhead work at the two new restrooms as marked on approved plan set okayed for cover.
|
FIR11-00222
| INSP-Final Inspection | 8/25/2011 | 8/26/2011 | 8/26/2011 4:29:33 PM | A | PART |
|
|
Missing approved plan set and review notes on site. Tested both new duct detectors on the 3rd floor for unit shutdown. Notification testing pending review of stamped plan set and red-lined annotations.
|