Inspections for the day of: Tuesday, August 26, 2014.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01177 BLD-Conference8/26/20148/26/20148/26/2014 3:27:07 PMPDONE
Remove existing sign cabinet. Manufacture and install one illuminated double face sign cabinet using existing pipe and embedment. Refurbish existing single face wall sign. Remove existing logo face, manufacture and install new face with new logo. All primary power remained the same. Phone #: ###-#### Inspection requested via web by Ken Olsen
BLD14-01177 DOC - Permit Finaled8/26/20148/26/20148/26/2014 3:26:56 PMPPASS
BLD13-03544 BLD-Energy code compliance8/22/20148/26/20148/26/2014 2:23:04 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-01507 BLD-Framing/Rough-in8/26/20148/26/20148/26/2014 1:51:38 PMPPASS
Jeremy Phone #: ###-####
BLD13-01766 BLD - Request for Extension8/25/20148/26/20148/26/2014 1:39:26 PMPPASS
JOSIAH Phone #: ###-####. Per homeowner, needs 30 days to be completed.
BLD14-02451 BLD-Final8/25/20148/26/20148/26/2014 1:03:59 PMADONE
Phone #: ###-#### Inspection requested via web by WALTER HOLLAND
MIS14-00094 DOC - Permit Finaled8/26/20148/26/20148/26/2014 1:02:21 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD13-03552 BLD-Wall Bracing8/25/20148/26/20148/26/2014 11:39:29 AMAPASS
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03553 BLD-Wall Bracing8/25/20148/26/20148/26/2014 11:39:16 AMAPASS
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03551 BLD-Wall Bracing8/25/20148/26/20148/26/2014 11:39:04 AMAPASS
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03550 BLD-Wall Bracing8/25/20148/26/20148/26/2014 11:38:51 AMAPASS
Please inspect between 9-10 am Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03542 BLD-Framing/Rough-in8/22/20148/26/20148/26/2014 10:49:36 AMAPASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03541 BLD-Framing/Rough-in8/22/20148/26/20148/26/2014 10:49:19 AMAPASS
Please call ahead Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-00216 BLD-Wall Bracing8/25/20148/26/20148/26/2014 9:56:36 AMAPASS
Richard Phone #: ###-####. 2nd. floor interior shear walls ok.
BLD14-00215 BLD-Framing/Rough-in8/25/20148/26/20148/26/2014 9:55:35 AMAPASS
Richard Phone #: ###-####. ok to insulate.
BLD14-00214 BLD-Wall Bracing8/25/20148/26/20148/26/2014 9:54:41 AMAPASS
Richard Phone #: ###-####. 1st. floor interior and exterior shear walls ok.
BLD14-00213 BLD-Wall Bracing8/25/20148/26/20148/26/2014 9:53:38 AMAPASS
Richard Phone #: ###-####. 2nd. floor interior shear walls ok.
BLD14-01103 BLD-Footing8/25/20148/26/20148/26/2014 9:45:31 AMAPASS
Interior rebar - Ken Phone #: ###-####
BLD13-03543 BLD-Energy code compliance8/22/20148/26/20148/25/2014 10:45:38 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark