Inspections for the day of: Tuesday, August 26, 2014.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00075 General Inspection8/26/20148/26/20148/26/2014 10:44:48 AM PASS
No changes at site. No corrections. Permit is still posted.
ESC13-01160 General Inspection8/26/20148/26/20148/26/2014 10:24:15 AM PASS
No activity or pre-construction mobilization at time of inspeciton. Old Hertz Car Sales is to be demolished and then parcel regraded and prepped for a Maverik.
ESC13-01087 Aging Inspection8/26/20148/26/20148/26/2014 10:06:47 AM PASS
Site is surrounded by security fence and lot graded below sidewalk curbing. No sediment from site in gutter, no trackout. WIP.
ESC13-00903 DOC - Permit Finaled8/26/20148/26/20148/26/2014 9:55:39 AMPPASS
Townhome complete and ESC conditions have been met.
ESC13-00906 Aging Inspection8/26/20148/26/20148/26/2014 9:54:01 AM PASS
Finaled.
ESC13-00906 DOC - Permit Finaled8/26/20148/26/20148/26/2014 9:53:49 AMPPASS
Townhome complete and landscaped. No further construction or materials at site. ESC conditions satisfied.
ESC13-01227 General Inspection8/26/20148/26/20148/26/2014 9:51:43 AM PASS
Painting and exterior canopy work still in progress. No disturbed earth or stockpiles. No corrections required.
ESC13-00911 Aging Inspection8/26/20148/26/20148/26/2014 9:47:01 AM PART
Verbal CN issued to contractor Cort who is working under homeowner RP.

Requested to sweep roads. No MS4 inlets or gutters but need to keep street clean. No other violations, had to reroute irrigation ditch throug culvert with permission from Boise City Canal.

Cort stated they will sweep today.
ESC14-00758 Site Preparation8/25/20148/26/20148/26/2014 9:33:12 AMAPASS
Bobby Phone #: ###-####

1 of 2 remaining open parcels at 36th Garden Center development. Woody Lane is relatively clean, no spills, or discharge. Inlet bags have more that 75% capacity. Permit is posted. Work will begin tomorrow once existing stockpile is removed and new concrete washout is constructed. Approved to proceed.
ESC13-00946 General Inspection8/26/20148/26/20148/26/2014 9:11:14 AM PASS
Eye Center is near completion. Parking lot is free of sediment and construction related spills. Needs landscaping and finishing touches. No corrections.
ESC14-00825 Site Preparation8/25/20148/26/20148/26/2014 9:04:57 AMAPASS
Lisa Phone #: ###-####

Garage addition to existing home on culdesac. No surface waters, MS4 drop inlet, and flat. Review ESC permit conditions with Lisa and discussed concrete washout BMPs. Permit is posted. Approved. Excavation will start tomorrow morning.
ESC13-00469 Aging Inspection8/26/20148/26/20148/26/2014 8:53:44 AM PASS
Finaled.
ESC13-00469 DOC - Permit Finaled8/26/20148/26/20148/26/2014 8:52:57 AMPPASS
Orchards duplex unit is complete, stabilized/landscaped. Entire complex is in good condition and all units near completion. No corrections required.
ESC14-00432 Random Inspection8/26/20148/26/20148/26/2014 8:44:23 AMPPART
No dust or discharges from site. Limits of clearance and 5 mile creek buffer + silt fence are effective. Some trackout to Lazaro and sediment in gutter on Lazaro and Overland. Need to investigate later this week and possibly request street sweeping.
ESC13-00545 Aging Inspection8/26/20148/26/20148/26/2014 8:33:28 AM PASS
Finaled.
ESC13-00545 DOC - Permit Finaled8/26/20148/26/20148/26/2014 8:33:17 AMPPASS
No construction activity. BLD is open because permit calls for a paved driveway to new garage but homeowner is unable to complete at this time. No ESC issues or unstabilized earth. Conditions satisfied/permit expired.
ESC13-01210 General Inspection8/26/20148/26/20148/26/2014 8:15:33 AM PASS
Addition to veterinary clinic is near completion. Need to stabilize surrounding area and some minor construction remains. No corrections required. Permit posted.
ESC14-00072 General Inspection8/26/20148/26/20148/26/2014 8:06:34 AM PASS
ESC14-00065 General Inspection8/26/20148/26/20148/26/2014 8:06:18 AM PASS
WIP at Cordillera 4-plexes. No trackout or sediment from site on Florence. The new curbing installed has a sediment trench and most drainage is directed towared the center of the site. No dust or spills on parking lot observed.
ESC13-01247 General Inspection8/26/20148/26/20148/26/2014 7:26:50 AM PASS
No acitivity. Waiting for fall rain events to see Mesa drainage channel is adequately vegetated & stabilized.
ESC14-00019 General Inspection8/26/20148/26/20148/26/2014 7:08:51 AM PASS
Finaled.
ESC14-00019 DOC - Permit Finaled8/26/20148/26/20148/26/2014 7:08:38 AMAPASS
Landmark Signs TI is complete. No further construction. ESC conditions satisfied.
ESC14-00738 Site Preparation8/25/20148/26/20148/25/2014 4:03:12 PMAPASS
Infill lot that is mostly flat and stormwater sheet flow is directed to lot. No MS4 or gutters on 20th Street where project is.

Need to post permit tomorrow morning. Main BMP will be housekeeping. Discussed project and ordinance with RP/GC Brett Ogata.