BLD15-02257
| FIRE-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 3:34:40 PM | P | CANC |
|
|
Rescheduled for friday.
|
FIR15-00356
| INSP-Sprinkler Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 3:31:44 PM | P | PASS |
|
|
24 hour air test passed
|
FIR15-00153
| INSP-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 2:49:37 PM | P | FAIL |
|
|
The only items test today was verifying the facp and nac panels, phone lines, elevator recall and fire sprinkler flow and tamper switches. I noted that the elevator power needs to be monitored but hat functions can remain as-is, all of the wall mount strobes are mounted too low, many of the strobes are overspaced, additional notification devices are required on the third floor in the areas that are to remain occupied. As-builts with these corrections and corrected floor plan layout will be required. I did not inspect any of the first floor or basement today.
|
FIR15-00408
| INSP-Sprinkler Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 11:58:31 AM | A | PART |
|
|
This is a partial rough to cover request. See the city approved plans for locations of hardlids areas that are ok to cover and the large shop area where the overhead rough-in piping has passed. Shop area is not ok to cover until another rough-in has passed for the drop sprinklers. Seismic bracing on branchlines still needs to be verified since nothing was address on the drawings.
|
FIR15-00534
| INSP-Sprinkler Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 10:17:55 AM | A | PASS |
|
|
underground supply line ok to cover
|
FIR15-00215
| INSP-Sprinkler Rough-in | 8/26/2015 | 8/26/2015 | 8/26/2015 10:16:12 AM | P | PASS |
|
|
Tenting and rough-in passed. Piping can be covered.
|
BLD15-00495
| FIRE-Final Inspection | 8/25/2015 | 8/26/2015 | 8/26/2015 8:52:00 AM | A | PASS |
|
|
life safety passed
|
BLD15-02156
| FIRE-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 8:50:21 AM | P | PASS |
|
|
Life safety passed
|
FIR15-00590
| INSP-Final Inspection | 8/25/2015 | 8/26/2015 | 8/26/2015 8:49:50 AM | A | PASS |
|
|
Permit finaled
|