BLD15-02017
| FIRE-Final Inspection | 8/25/2015 | 8/26/2015 | 8/26/2015 2:02:30 PM | A | PASS |
|
|
Life fire safety passed/complete
|
FIR15-00446
| INSP-Sprinkler Rough-in | 8/26/2015 | 8/26/2015 | 8/26/2015 12:25:19 PM | A | PASS |
|
|
Rough to cover inspection passed/complete, approved for cover.
|
FIR15-00413
| INSP-Sprinkler Rough-in | 8/26/2015 | 8/26/2015 | 8/26/2015 12:21:01 PM | A | PART |
|
|
Inspected mains and branch-lines, fire sprinkler heads will be cut in when finish ceiling is installed, will need to perform rough to cover inspection when heads are installed.
|
FIR15-00337
| INSP-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 12:18:16 PM | A | PASS |
|
|
Final alarm inspection passed/complete
|
FIR15-00338
| INSP-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 12:16:36 PM | A | PASS |
|
|
Final fire alarm testing passed/complete
|
FIR15-00422
| INSP-Final Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 12:13:54 PM | A | PASS |
|
|
Final alarm testing passed/complete
|
FIR15-00249
| INSP-Alarm Testing | 8/25/2015 | 8/26/2015 | 8/26/2015 9:26:18 AM | A | PART |
|
|
Notated devices tested/operated with red ink on the city approved drawings.
|
FIR15-00228
| INSP-Sprinkler Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 9:24:33 AM | P | PART |
|
|
Rough to cover inspection passed/complete, notated area's approved for cover with red ink on city approved drawings.
|