ESC13-00213
| General Inspection | 8/26/2015 | 8/26/2015 | 8/27/2015 1:50:15 PM | | PASS |
|
|
WIP re excavating site layout and drainage design. No discharges from site, no significant amounts of sediment leaving site.
|
ESC15-00261
| Site Preparation | 8/26/2015 | 8/26/2015 | 8/26/2015 3:59:57 PM | P | PASS |
|
|
Rocket Wash carwash is in progress. Building structure is erect, but site has to be built up. Permint sign and SWPPP info located at construciton entrance on Cloverdale. No trackout or discharges, no water truck seen on site, but no fugitive dust issues observed and no complaints have been received. Site has restricted access on Fairview with no dirt or trackout able to leave site to the north. Lined concrete washout pit has been utilized for the work.
Approved.
|
ESC13-00230
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 3:22:27 PM | | CANC |
|
|
|
ESC15-00925
| Random Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 2:55:25 PM | P | PASS |
|
|
WIP. Flat lot in previously developed but unoccupied subdivision culdesac. Permit sign posted, no discharge or wind blown litter. MS4 at Florid and Cloverdale has an inlet bag installed (probably from development) that is still effective and can remain.
|
ESC13-01323
| Complaint Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 2:53:40 PM | P | PART |
|
|
Dust complaint received for Cantabria Development.
Landscaping crews are on site finishing open area landscaping. Majority of the 22 4 plexes are complete, many are even occupied by tenants. WIP.
No dust plumes observed leaving site, but with landscapers potentially using dust blowers the complaint could be valid. Notified RP Ken to instruct those using blowers to sweep up larger piles and blows dust toward Overland.
Also notified Ken to remember to remove all temporary BMPs (inlet filter bags on Overland and Cloverdale, silt fence along canal) when work is complete.
|
ESC15-00939
| Site Preparation | 8/26/2015 | 8/26/2015 | 8/26/2015 2:44:27 PM | P | PART |
|
|
Phone #: 9144370 >> Inspection requested via mobile web by Bryan Millar
Permit sign posted and Dropzone projects are in fairly good condition. No trash, trackout, or sediment runoff issues. Approved to excavate foundation.
Corrections for Dropzone: 1. Install DI bags for future construction on the two inlets and Abrams and Freewater. 2. Clean up old concrete washout. Pick up miscellaneous concrete chunks left on open parcel. 3. Provide new designated concrete washout area(s)
|
ESC15-00254
| Aging Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 2:02:42 PM | | PASS |
|
|
Home is near completion with some interior work ongoing. Yard is landscaped and streets cleaned. No temp BMPs to remove. No further ESC inspections, permit conditions met.
|
ESC15-00253
| Aging Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 2:02:28 PM | | PASS |
|
|
Home is near completion with some interior work ongoing. Yard is landscaped and streets cleaned. No temp BMPs to remove. No further ESC inspections, permit conditions met.
|
ESC15-00253
| DOC - Permit Finaled | 8/26/2015 | 8/26/2015 | 8/26/2015 2:01:22 PM | P | PASS |
|
|
|
ESC15-00957
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 1:51:25 PM | P | PASS |
|
|
WIP on sewer and utilities for new Belmar subdivision. Work is concentrated around single trench area so no fugitive dust issues observed. No dewatering discharges observed offsite. No trackout onto Pierce Park; ESC permit sign and CGP information is posted. Approved.
|
ESC15-01044
| Site Preparation | 8/25/2015 | 8/26/2015 | 8/26/2015 12:48:28 PM | A | PASS |
|
|
Adam Phone #: ###-####
Permit sign is posted. Eagle Ridge Homes in SunnyRidge are in compliance. BMPs installed. Approved for construction.
|
ESC15-00180
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 11:32:32 AM | | PART |
|
|
Site prep inspection conducted with site pre-grading/grubbing on ESC15-00822. No significant trackout or loose sediment leaving site at new Holiday Inn, but very few BMPs installed around site. It is flat with limited MS4 infrastructure surrounding area.
Need to install constrution entrance and some more significant perimeter controls. Will schedule meeting with RP Bob to discuss what controls are need. Permit information located in job trailer.
|
ESC13-00193
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 10:54:02 AM | | PASS |
|
|
No construction activity in Somerset 3. Site is being actively monitored and BMPs maintained. Some additional wattles have been recently installed on the uphill side of the culdesac and DI bags have been emptied and re-installed. No corrections issued.
|
ESC11-00192
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 10:47:00 AM | | PASS |
|
|
3 active SFHs in Somerset Ridge. Streets and gutters are clean, no discharges, loose sediment, or other materials . Trash is being contained. DI bags are installed.
Since subdivision was graded many years ago, cut hills have vegetated and are stable. Empty lots have perimeter wattles installed at driveway aprons to contain sediment runoff. No corrections at this time.
|
ESC15-00862
| Site Preparation | 8/25/2015 | 8/26/2015 | 8/26/2015 10:35:18 AM | A | PASS |
|
|
Rod Phone #: ###-####
Meeting with RP and excavator onsite. Perimeter BMPs (straw wattles) are installed. Requested that downslope wattles be trenched into the ground by the end of the week. A orange construction fence has been installed at the bottom clearing limits to preserve perimter vegetation. Rock retaining wall already installed by homeowner and RPC.
Lined cement washtut and construction entrance installed next to ESC permit sign.
Approved to start excavation, will check for wattle trenching next inspection.
|
ESC14-00664
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 9:20:33 AM | | PASS |
|
|
|
ESC15-00181
| General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 8:53:23 AM | | PASS |
|
|
Carport complete. Loose sediment cleaned and swept up. All permits finaled.
|
ESC15-00181
| DOC - Permit Finaled | 8/26/2015 | 8/26/2015 | 8/26/2015 8:52:47 AM | P | PASS |
|
|
|