FIR19-00426
| INSP-Final Inspection | 8/24/2019 | 8/26/2019 | 8/26/2019 3:59:20 PM | P | PASS |
|
|
Permit finaled
Contact Andrew Larson ###-#### 30 Min prior to Final Insp start please, He request that this be later in the pm so Back Cert can be certified by Pacific Back Flow.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR19-00384
| INSP-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 3:58:54 PM | P | FAIL |
|
|
Need an additional duct smoke detector added/tested and as-builts. Inspection was performed by Lee.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00589
| INSP-Sprinkler Rough-in/Hydro | 8/26/2019 | 8/26/2019 | 8/26/2019 3:38:15 PM | P | PASS |
|
|
Underground hydro witnessed.
Troy will call when ready for inspection. This inspection is for an underground service Hydro-test. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR19-00275
| INSP-Sprinkler Rough-in | 8/26/2019 | 8/26/2019 | 8/26/2019 3:37:38 PM | P | PASS |
|
|
Rough-in passed for the two rooms. Combustible concealed spaces are full of insulation. Piping can be covered.
Kerry Turner Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
BLD19-00703
| FIRE-Final Inspection | 8/23/2019 | 8/26/2019 | 8/26/2019 2:23:14 PM | P | FAIL |
|
|
Provide knox box, provide annual inspection for fire sprinkler system, provide single action hardware for the three doors in basement, provide address as discussed,
Mike Phone #: ###-####
|
BLD19-01979
| FIRE-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 2:00:31 PM | P | FAIL |
|
|
Provide annual inspection for the fire extinguisher, provide exit signs and emergency lights as per the city approved plans. Scott Phone #: ###-####
|
FIR19-00524
| INSP-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 1:59:39 PM | P | CANC |
|
|
Not all ceiling has been built/installed. Adam Phone #: ###-####
|
BLD19-00286
| FIRE-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 1:11:43 PM | P | FAIL |
|
|
Left message on contacts voice mail that I was on the way. Got to project site but did not make contact with anyone except the owner. She did not have plans. No inspection performed. Jay Phone #: ###-####
|
BLD19-01546
| FIRE-Final Inspection | 8/23/2019 | 8/26/2019 | 8/26/2019 12:35:44 PM | A | FAIL |
|
|
No approved plans or small documents on site. I did spot check for the min. 26' clearance in several locations which they met. call on arrival Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD19-03141
| FIRE-Final Inspection | 8/23/2019 | 8/26/2019 | 8/26/2019 10:24:07 AM | A | PART |
|
|
A temporary for life safety is being given until the work for the adjoining space 180 is complete which includes an exterior door in this space. Also an exit sign/emergency light needs to be added at the exit to the interior corridor. Fire Alarm and Sprinklers are being upgraded under FIR19-00522 and FIR19-00578. I will be onsite from 9am on. Thank you. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
|
BLD19-02890
| FIRE-Final Inspection | 8/22/2019 | 8/26/2019 | 8/26/2019 8:19:55 AM | A | FAIL |
|
|
Suite number needs figured out. Computer says 170, main entrance sign says 175, door to the suite says 150.
Tiana Phone #: ###-####
|
FIR19-00555
| INSP-Final Inspection | 8/22/2019 | 8/26/2019 | 8/26/2019 7:46:18 AM | A | CANC |
|
|
Inspector for this project called in sick, contractor wanted 7am but did not corridinate with inspector. I tried to make phone contact with fire alarm tech but was only able to leave message at 7:39am. No inspection was performed.
This inspection needs to happen at 7 am, before the buildings open for business. Please coordinate with Damien @ ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan
|