BLD01-00915
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | NR |
|
|
called, spoke w/ contractor, elec work just completed for basketball boards...will call for final. Boise High gym. 8/27/2001 9:47:58 AM
|
BLD00-03479
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | NR |
|
|
fnd. only permit, will final w/ project 8/27/2001 9:41:54 AM site work only permit, will final w/ project 8/27/2001 9:41:54 AM 8/27/2001 9:42:49 AM
|
BLD00-03361
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | PART |
|
|
St Lukes East tower/ NICU; wip 8/27/2001 11:35:53 AM
|
BLD00-02375
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | PART |
|
|
St lukes east tower/ framing. wip 8/27/2001 11:36:30 AM
|
BLD01-00767
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | NR |
|
|
sign, no call 8/27/2001 11:23:55 AM
|
BLD01-00882
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | NR |
|
|
possible problem job, no call since correction... 8/27/2001 11:28:06 AM
|
BLD01-01052
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | NR |
|
|
deck, will final with house remodel project 8/27/2001 11:53:29 AM
|
BLD01-00821
| BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | | PART |
|
|
homeqwnert job, wip 8/27/2001 11:55:05 AM
|
BLD01-01201
| BLD-Conference | 8/24/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | A | PASS |
|
|
###-#### marcella ; need verify header at int; complete sheathing, consult roofer. 8/27/2001 10:44:40 AM
|
BLD01-01312
| BLD-Other | 8/24/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 14:04:32. Contact: ###-####...consulted w/ Craig w/ New space; may need design for racks or no storage above 8'; install per manuf. recall when ready. 8/27/2001 12:05:37 PM
|
BLD01-01821
| BLD-Framing/Rough-in | 8/26/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/26/2001 at 19:19:47. Contact: ###-####. corrections made, ok to insul. 8/27/2001 11:46:00 AM
|
BLD00-03361
| BLD-Conference | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/27/2001 11:30:10 AM w/ Wendall onsite. wip, receiving spec insp reports.
|
BLD01-01346
| BLD-Framing/Rough-in | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 07:48:57. Contact: ###-####. walls ok pend elec 8/27/2001 5:08:28 PM
|
BLD99-03148
| BLD-Final | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | NR |
|
|
brett ###-####--fn occ--3rd floor ? need fire. 8/27/2001 3:40:53 PM
|
BLD01-02178
| BLD-Footing | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | PART |
|
|
###-#### larry wip, looks ok. 8/27/2001 11:26:52 AM
|
BLD01-01635
| BLD-Footing | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | PART |
|
|
###-#### kevin, poured appears ok 8/27/2001 5:05:40 PM
|
BLD01-00531
| BLD-Concrete | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | PART |
|
|
###-#### scott upper floor exit balconies. 8/27/2001 3:44:20 PM
|
BLD00-03729
| BLD-Foundation | 8/27/2001 | 8/27/2001 | 8/27/2001 12:00:00 AM | P | PART |
|
|
###-#### pend SI report 8/27/2001 3:42:22 PM
|