Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00915 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM NR
called, spoke w/ contractor, elec work just completed for basketball boards...will call for final. Boise High gym. 8/27/2001 9:47:58 AM
BLD00-03479 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM NR
fnd. only permit, will final w/ project 8/27/2001 9:41:54 AM site work only permit, will final w/ project 8/27/2001 9:41:54 AM 8/27/2001 9:42:49 AM
BLD00-03361 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM PART
St Lukes East tower/ NICU; wip 8/27/2001 11:35:53 AM
BLD00-02375 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM PART
St lukes east tower/ framing. wip 8/27/2001 11:36:30 AM
BLD01-00767 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM NR
sign, no call 8/27/2001 11:23:55 AM
BLD01-00882 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM NR
possible problem job, no call since correction... 8/27/2001 11:28:06 AM
BLD01-01052 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM NR
deck, will final with house remodel project 8/27/2001 11:53:29 AM
BLD01-00821 BLD-Aging Inspection8/27/20018/27/20018/27/2001 12:00:00 AM PART
homeqwnert job, wip 8/27/2001 11:55:05 AM
BLD01-01201 BLD-Conference8/24/20018/27/20018/27/2001 12:00:00 AMAPASS
###-#### marcella ; need verify header at int; complete sheathing, consult roofer. 8/27/2001 10:44:40 AM
BLD01-01312 BLD-Other8/24/20018/27/20018/27/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/24/2001 at 14:04:32. Contact: ###-####...consulted w/ Craig w/ New space; may need design for racks or no storage above 8'; install per manuf. recall when ready. 8/27/2001 12:05:37 PM
BLD01-01821 BLD-Framing/Rough-in8/26/20018/27/20018/27/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/26/2001 at 19:19:47. Contact: ###-####. corrections made, ok to insul. 8/27/2001 11:46:00 AM
BLD00-03361 BLD-Conference8/27/20018/27/20018/27/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/27/2001 11:30:10 AM w/ Wendall onsite. wip, receiving spec insp reports.
BLD01-01346 BLD-Framing/Rough-in8/27/20018/27/20018/27/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/27/2001 at 07:48:57. Contact: ###-####. walls ok pend elec 8/27/2001 5:08:28 PM
BLD99-03148 BLD-Final8/27/20018/27/20018/27/2001 12:00:00 AMPNR
brett ###-####--fn occ--3rd floor ? need fire. 8/27/2001 3:40:53 PM
BLD01-02178 BLD-Footing8/27/20018/27/20018/27/2001 12:00:00 AMPPART
###-#### larry wip, looks ok. 8/27/2001 11:26:52 AM
BLD01-01635 BLD-Footing8/27/20018/27/20018/27/2001 12:00:00 AMPPART
###-#### kevin, poured appears ok 8/27/2001 5:05:40 PM
BLD01-00531 BLD-Concrete8/27/20018/27/20018/27/2001 12:00:00 AMPPART
###-#### scott upper floor exit balconies. 8/27/2001 3:44:20 PM
BLD00-03729 BLD-Foundation8/27/20018/27/20018/27/2001 12:00:00 AMPPART
###-#### pend SI report 8/27/2001 3:42:22 PM